Laserfiche WebLink
sheet 1 of 2 <br />PROJECT IDENTIFICATION <br />Agency or or( <br />Task #: 05A <br />Date : 0912412009 <br />User : JHB <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />lanization name : Division Of Reclamation, Mining And Safety <br />State : Colorado Permit/job #: C-1981-028 <br />County:Weld Abbreviation :none <br />Site: Keenesbura Strip Mine Filename :C028-05A <br />Permit or other job action : S14 <br />Task description :Backfill remaining volume Pit B <br />HOURLY EQUIPMENT COST <br />Shift basis <br />(Equipment Description <br />1 per day <br />Cost Bre <br />Scraper work team -scraper : Gat 6376 w7push-pull <br />-Push dozer:NA <br />Support equipment -Load area : JCat D9R - 9SU (2005) <br />-Dump area :[NA <br />Road maintenance -Motor grader :LCAT 14H <br />-Water truck :I Water Tanker, 3,500 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA dozer NA grader misctruk <br />% Utilization-machine : 100 NA 100 NA 25 25 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $108.62 NA $58.86 NA $41.72 $11.29 <br />Operating cost/hour : $230.60 NA $126.03 NA $15.30 $9.03 <br />Ripper op. cost/hour : NA NA $0.00 NA $0.00 NA <br />Operator cost/hour : $38.72 NA $38.54 NA $38.91 $38.70 <br />Unit subtotals : $377.93 NA $223.43 NA $95.92 $59.02 <br />Number of units : 4 0 1 0 1 1 <br />Group subtotals : Work : $1,511.74 Support: $223.43 Maintenance : $154.94 <br />Total work team cost/hour : $1,890.10 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 265,372 BCY factor : 1.266 volume : 335,913 LCY <br />Source of quantity take-off :2008 Annual Reclamation Report <br />Source of estimated swell factor : Caterpillar Handbook