My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-13_REVISION - C1981028
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981028
>
2009-10-13_REVISION - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:09 PM
Creation date
10/14/2009 9:47:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
REVISION
Doc Date
10/13/2009
Doc Name
Review Letter & Cost Estimate
From
DRMS
To
Coors Energy Company
Type & Sequence
SR1
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADJUSTED COSTS <br /> <br />Depreciation Ownership Costs <br /> <br />CFC <br /> <br />Overhead <br />Overhaul <br />Labor Parts Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel <br /> <br />Lube <br /> <br />Tires sheet 2 of 2 <br /> <br />G.E.C. <br />Acquisition cost : $11.30 NA NA NA NA NA NA NA NA NA NA <br />Econ.life -Machine and Attach. no. 1 : $11.30 NA NA $2.23 $3.89 $2.76 $3.74 NA NA NA NA <br />-Attachment no. 2: NA NA NA $0.00 $0.00 $0.00 $0.00 NA NA NA NA <br />Annual usage : $1652 $6.81 $10.27 NA NA NA NA NA NA NA NA <br />Double shifts : $12.39 $3.41 $5.14 NA NA NA NA NA NA NA NA <br />Triple shifts : $11.02 $2.27 $3.42 NA NA NA NA NA NA NA NA <br />Mech. Ibr.-Machine and Attach. No. 1: NA NA NA $2.02 NA $2.50 NA NA NA NA NA <br />-Attachment no. 2 : NA NA NA $0.00 NA $0.00 NA NA NA NA NA <br />Fuel/tube -Machine and Attach. No. 1: NA NA NA NA NA NA NA $31.37 $5.06 $4.35 $0.48 <br />Attachment no. 2: NA NA NA NA NA NA NA $0.00 $0.00 $0.00 $0.00 <br /> <br />ADJUSTED COST SUBTOTALS <br /> <br />Depreciation Ownership Costs <br /> <br />CFC <br /> <br />Overhead <br />Overhaul <br />Labor Parts Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel <br /> <br />Lube <br /> <br />Tires <br /> <br />G.E.C. <br />Basic Machine and attachments No. 1 and No. 2: Basic Machine and Attachment No. 1 <br />Single shifts : $16.52 $6.81 $10.27 $2.02 $3.89 $2.50 $3.74 $31.37 $5.06 $4.35 $0.48 <br />Double shifts : $12.39 $3.41 $5.14 ttachment No. 2 <br />Triple shifts : $11.02 $2.27 $3.42 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />HOURLY OPERATOR WAGES Base Fringe F.I.C.A. Unempl. Wk.Comp. Total <br /> Rate Benefits 7.65% 6.20% 10.00% ($/hr) Shift Differential Colorado labor zone : 1 <br />Loader operator (-6cy) $23.67 $9.22 $1.81 $1.47 $2.37 $38.54 Day : $0.00 Two shift per day average : $0.15 <br />Loader operator (> 6cy) $23.82 $9.22 $1.82 $1.48 $2.38 $38.72 Swing : $0.30 Three shift per day average : $0.25 <br />Mechanic $23.82 $9.22 $1.82 $1.48 $2.38 $38.72 Night : $0.45 <br />HOURLY EQUIPMENT COST SUMMARY Ownership Operating and Overhaul <br />Machine Attachments Operator Total <br />Cost/hr ($) <br />Single shifts : $33.60 $53.42 NA $38.54 $125.55 <br />Double shifts : $20.93 $53.42 NA $38.69 $113.03 <br />Triple shifts : $16.71 $53.42 NA $38.79 $108.91 <br />EQUIPMENT PERFORMANCE DATA <br />Description Type Struck <br />Capacity (cy) Heaped <br />Capacity (cy) Weight <br />(UST) Weight <br />(MT) Length <br />(ft.) Width <br />(ft.) Height <br />(ft.) Min. turning <br />circle (ft.) Horsepower <br />(fhp) Fuel <br />type <br />CAT 966G (2002) NA 4.06 4.75 25.10 NA 29.58 10.33 11.67 48.25 235.00 Diesel <br />ROPS Cab NA NA NA NA NA NA NA NA NA NA NA <br />NA NA NA NA NA NA NA NA NA NA NA NA <br />Travel speeds (mph) : 1 st (or max.) 2nd 3rd 4th 5th 6th 7th 8th Min. dump Max.dump <br />Forward : 4.5 7.8 13.5 23.1 NA NA NA NA clear.(ft) hL(ft) <br />Reverse : 5.1 8.9 15.3 26.2 NA NA NA NA NA 9.75 <br />Loader bucket type Compaction Maximum vertical Max. horizontal Excavator bucket capacity (cy) Lift capacity (lbs) Maximum dig/rip Shank Number <br />or compactor drum type width per pass (ft.) reach height (ft) reach (ft) small medium large optimum max.reach depth (ft) spacing of shanks <br />GP with teeth NA NA NA NA NA NA NA NA NA NA NA
The URL can be used to link to this page
Your browser does not support the video tag.