Laserfiche WebLink
BOREHOLE SEALING WORK <br />Task #: 48 <br />Mine: Keenesburg Mine <br />Permitno.: C1981-028 <br />Permitting action: MT5 <br />Date: 4/30/09 <br />User: jhb <br />wt of bulk cement <br />C <br />em <br />2,500 gal Water <br />Octoplug Cut surface <br />Hole Total Hole (assuming 94 Itis of <br />Cement cost Total rig Rig wl crew <br />water truck truck w/ <br /> <br />i <br />(Circes, casing & <br /> <br />k <br />cement per 1.18 cf of Cement Rig setup time Rig time to time hourly rate Total w/driver dr <br />ver cost 57 <br />519 mar <br />Total cost <br />Hole diam. depth volume per cwt <br />total cost <br />hole, that is 100 Ibs per hole (hr) fill hole (setup + (Circes, Reed rig cost <br />hourly rate <br />(rig fill . <br /> <br />in. <br />per <br />(Circes, <br />(CIRCES) <br />(in) (ft) (cf) <br />of cement fills 1.25 fill) drill, 9.0") <br />(Circes) x <br />time <br />diam.) $5.4611f+$2.1 <br />cf) truck rate) 71marker) <br />FPW1 8 61 21 17.0 $7.46 $127 0.67 0.50 1.17 $224.03 $262 $60 $30 $157 $8 $583 <br />Water Supply 8 620 216 173.1 $7.46 $1,291 1.52 2.16 3.68 $224.03 $825 $60 $130 $157 $8 $2,410 <br />DH96 5 55 7 6.0 $7.46 $45 0.67 0.50 1.17 $224.03 $262 $60 $30 $98 $8 $442 <br />DH122 5 43 6 4.7 $7.46 $35 0.42 0.50 0.92 $224.03 $206 $60 $30 $98 $8 $377 <br />SMW-2 4.75 97 12 9.5 $7.46 $71 0.67 0.50 1.17 $224.03 $262 $60 $30 $93 $8 $464 <br />AMW-1 4.5 61 7 5.4 $7.46 $40 0.67 0.50 1.17 $224.03 $262 $60 $30 $88 $8 $428 <br />AMW-2 6 51 10 8.0 $7.46 $60 0.67 0.50 1.17 $224.03 $262 $60 $30 $117 $8 $477 <br />Total hours 10.45 Grand total $5,181 <br />Divided by number of rigs 1 <br />Net total hours 10.45