Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Water Tanker, 2,500 Gal. $68.62 1 $68.62 $68.62 <br />-Light Duty Pickup, 4x4, 1 T. Crew $50.27 2 $100.54 $100.54 <br />-Fuel Tanker, 4x2, 170 HP $71.21 1 $71.21 $71.21 <br />-Lube Truck, 4x2, 170 HP $79.11 1 $79.11 $79.11 <br />-Generic 8-10 cy, 6x4 $84.41 3 $253.23 $253.23 <br />-Generic 12-18 cy, 6x4 $105.28 6 $631.71 $631.71 <br /> <br />-Flatbed Truck, 4x2, 30K GVW $54.93 1 $54.93 $54.93 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $1,259.36 $1,259.36 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Brighton <br />Transoortation Cycle Time : Non- Total one-way travel distance : 20.0 miles <br /> Roadable Roadable Average travel speed : 50.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.40 0.40 Total non-roadable mob/demob cost $6,442.28 <br />Return time (hours) = 0.40 0.40 ` two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost "" : $1,007.49 <br />Unloading time (hours) = 0.50 NA •• one round trip, no haul rig <br />Subtotals = 1.80 0.80 <br />JOB TIME AND COST Total job time : 3.60 hours <br /> Total job cost : $7,450