Laserfiche WebLink
CIRCES Cost EstimatingSoftware <br />DEMOLITION WORK <br />PROJECT IDENTIFICATION Agency or organization name : Division Ot Reclamation, Mining And Safety <br />Task #: 058 State : Colorado Permit/job# : C-1981-028 <br />Date : 25-Sep-2009 County :Weld Abbreviation :none <br />User : JHB Site : Keenesburg Mine Filename :C028-058 <br />Permitting action :SL4 <br />Task description :Facilities and structural demolitlott <br />UNIT COSTS Last unit cost update : Location adjustment : 95.50% <br />STRUCTURE or ITEM DESCRIPTION DIMENSIONS DEMOLITION MENU SELECTION QUANTITY UNIT UNIT COST TOTAL COST <br />-1. Powder magazine-cinder block walls 21'x 28x 10'h Demo./disp./existing pd - 10K' haul 5,880.00 CF $0.2281 $1,341.08 <br />- Powder magazine concrete floor 21x 28' Demo./disp. exs. pit, 4" th.- 10K ft. 588.00 SF $1.1389 $669.65 <br />-2. Office building-metal 81'x 70'x 10'h Demo./disp./existing p8 - 10K' haul 56,700.00 CF $0.2230 $12,641.75 <br />- Office building floor & foundation 81'x 70' Demo./disp. exs. pit, 4" th.- 10K ff. 5,670.00 SF $1.1381 $6,452.95 <br />-3. Shop building-Metal 61'x 70'x 28'h Demo./disp./existing pit - IOK' haul 119,560.00 CF $0.1861 $22,253.31 <br />- Shop building-Floor 61'x 70'x 1'th. Demo./disp. exs. pd, 12"th.-10Kft. 42,700.00 SF $3.4143 $145,788.83 <br />-18'x 11'x 12'h 18x 11'x 12'h Demo./disp./existing pd - 10K' haul 2,376.00 CF $0.2230 $529.75 <br />- storage area, mic. equip. & supplies 27000 CY Demo./disp./existing pit - 10K' haul 27,000.00 CF $0.1982 $5,351.72 <br />-5. remove powerline 6000 An. ft. Power/phone line - single pole 6,000.00 LF $2.7737 $16,642.08 <br />-6. Remove Culverts 507 x 96" dia. Pipe, CMP - 96 in. diam. 50.00 LF $30.8135 $1,540.68 <br />-7. Shop building west concrete apron 18'X 98'x 0.83' th Demo./disp. exs. pit, 10" th.-10K ft. 1,764.00 SF $2.8452 $5,018.96 _ <br />-8. Concrete slab East Apron @ shop 40'x 18'x 0.83th Demo./disp. exs. pit, 10" th.-10K ft. 720.00 SF $2.8452 $2,048.55 <br />-9. concrete slab-loading dock 9'x 14'x 0. Fth Demo./disp. exs. pit, 6" th.- 10K ft. 126.00 SF $1.7071 $215.10 <br />-10. Skid mounted garage 28x 26x 18'h Demo./disp./existing pit - 50' push 13,104.00 CF $0.1743 $2,283.88 <br />-11. 7.1 miles fencing 7.1 miles Fencing, barbed wire, - 3 strand 37,488.00 LF $1.1684 $43,802.48 <br />-12. Sewage Treatment plant 11'x 30'x 10'h Demo./disp./existing pit - 10K' haul 3,300.00 CF $0.2230 $735.76 <br />- Sewage TMt. plant concrete slab 11 x 30'x. 33th. Demo./disp. exs. pit, 4" th.- 10K ft. 330.00 SF $1.1381 $375.57 <br />-13. Petroleum tanks and support legs 15'x 20'x 15'h (tanks) Haul to cert. dump - 3K- 5K gal. 1.00 EA $725.0000 $725.00 <br />Tank storage sill 15'x 20'x0.33th Demo./disp. exs. pit, 4" th.- 10K ft. 300.00 SF $1.1389 $341.66 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />JOB COST Subtotal (unadjusted): $268,759 Total Cost (adjusted for location): $256,665