Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimatinci Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name :Division Of Reclamation, Mining And Safety <br />Task #: 033 State :Colorado Permit/job #: C-81-028 <br />Date : 0912412009 County:Weld Abbreviation :none <br />User : JHB Site :Keenesburg Filename: C028-033 <br />Permit or other job action : S14 <br />Task description :Haul 4630 CY topsoil to facilities area <br />HOURLY EQUIPMENT COST <br />pment Description <br />Cost Bre <br />1 per day <br />Scraper work team -Scraper : Cat 637G w/push-pull <br />-Push dozer:NA <br />Support equipment -Load area : Cat D9R - 9SU (2005) <br />-Dump area :NA <br />Road maintenance -Motor grader : NA <br />-Water truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA dozer NA NA NA <br />% Utilization-machine : 100 NA 25 NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $108.62 NA $58.86 NA NA NA <br />Operating cost/hour : $230.60 NA $31.51 NA NA NA <br />Ripper op. cost/hour : NA NA $0.00 NA NA NA <br />Operator cost/hour : $38.72 NA $38.54 NA NA NA <br />Unit subtotals : $377.93 NA $128.90 NA NA NA <br />Number of units : 2 0 1 0 0 0 <br />Group subtotals : Work : $755.87 Support : $128.90 Maintenance : $0.00 <br />Total work team cost/hour : $884.77 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 4,630 CCY factor : 1.060 volume : 4,908 LCY <br />Source of quantity take-off :Permit Committment, 6 Inches topsoil <br />Source of estimated swell factor : Caterpillar Performance Handbook 23rd. ed. <br />Shift basis :