Laserfiche WebLink
i <br />October 9, 2009 <br />Horse Gulch Fill Quarterly Inspection Report <br />Third Quarter of 2009 <br />Table of Contents <br />1.0 Introduction 1 <br />2.0 Critical Construction Periods 2 <br />2.1 Removal of All Organic Material and Topsoil 2 <br />2.2 Placement of Underdrainage Systems 4 <br />2.3 Installation of Surface Drainage Systems 17 <br />2.4 Placement and Compaction of Fill Materials 17 <br />2.5 Revegetation 17 <br />3.0 References 17 <br />Appendix A - Drawings 18 <br />I certify that this report was prepared by me. <br />Seth Austin Puls <br />CO PE 41406 <br />Senior Engineer <br />Trapper Mining, Inc. <br />o?pFtADOd??c? <br />G••??N AUSrj?? ?*.LO <br />`O <br />u? . <br />41406 <br />ss?ONAI ENG???? <br />PROFESSIONAL SEAL <br />1