My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-13_PERMIT FILE - M2009079
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009079
>
2009-10-13_PERMIT FILE - M2009079
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:08 PM
Creation date
10/13/2009 1:12:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009079
IBM Index Class Name
PERMIT FILE
Doc Date
10/13/2009
Doc Name
New 112c application
From
Precision Excavating, Inc.
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rule 6.4.5 EXHIBIT E - Reclamation Plan <br />(1) The proposed grading at time of final reclamation is shown on Map 6, Reclamation <br />Plan Map. This map also shows the location of five proposed cross-sections which <br />depict the proposed final slopes which will be encountered during the reclamation <br />phase of the operation. Map 7, Mine & Reclamation Plan Cross Sections depict the <br />existing grade and final grade after reclamation for each cross section. The outer <br />perimeter of the mine will be graded to a minimum of 3:1 slopes to ensure long term <br />stability. The interior of the mine will be graded to conform to the general east to west <br />slope of the existing land. There will be no impoundments. <br />(2) (a) All of the affected lands are currently range land. Reclamation will restore all of <br />the affected land to range land. The amount of disturbed land will be limited to <br />35 acres at any one time. We anticipate approximately 20 of the 35 acres will be <br />active mining area at any one time. Once mining is complete the slopes will be <br />reclaimed to grades shown on the Reclamation Plan Map. On-site soils within <br />the pit area will be used for backfill to establish the reclaimed slopes. If available, <br />the Operator will accept clean, imported fill. Precision Excavating, Inc. will <br />commit to comply with the notice to the office requirements of Rule 3.1.5(9) <br />before importing fill material. <br />(b) The post-mining use will be range land which is consistent with the existing land <br />use in the vicinity of the project. This is also consistent with the Moffat County <br />Zoning designation for this property, which is A-Agriculture. <br />(c) Section 3.1 <br />3.1.1 Establishing Post-Mining Use: The Operator has consulted with the <br />Landowner and agree the land will be reclaimed to the original use of range land. <br />3.1.2 Reclaiming Substituted Land: N/A <br />3.1.3 Time Limit and Phased Reclamation: The Operator commits to complete <br />each phase of reclamation within five (5) years from the date that such phase has <br />commenced. <br />3.1.4 Public Use: N/A <br />3.1.5 Reclamation Measures - Materials Handling: Grading will be performed so <br />as to create the final topography shown on the Reclamation Plan. The Operator <br />shall replace waste materials in the mined area and will utilize appropriate earth <br />moving equipment to ensure adequate compaction for stability. The grading will <br />be done in a manner to control erosion and siltation of the affected lands through <br />use of stormwater diversion ditches and settling ponds. All highwalls will be <br />stabilized to 3:1 slopes as soon as possible following mining excavation. The <br />overall backfilling and grading will be completed as soon as there is enough room <br />to safely operate the earthmoving equipment. Precision Excavating will control <br />the unauthorized release of pollutants to the surface drainage system and <br />groundwater. The fuel tanks will be either the double-walled, self contained type <br />of tank or surrounded by a lined berm to prevent any spills. Precision Excavating <br />has mechanics on staff that perform routine maintenance on equipment to prevent <br />leaks. <br />3.1.6 Water - General Requirements: The proposed mining operation will not <br />have any affect on the prevailing hydrologic balance of the affected land and <br />surrounding area, nor any affect on the quantity or quality of water in surface and
The URL can be used to link to this page
Your browser does not support the video tag.