My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-05_INSPECTION - M1978221
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1978221
>
2009-10-05_INSPECTION - M1978221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:59 PM
Creation date
10/8/2009 9:09:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978221
IBM Index Class Name
INSPECTION
Doc Date
10/5/2009
Doc Name
Inspection report
From
DRMS
To
Lowell & Lenny Klinglessmith
Inspection Date
9/23/2009
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />PROJECT IDENTIFICATION <br />Task # : 02a State : Colorado Permit/job #:M-1978-221 <br />Date : 1010512009 County: Rio Blanco Abbreviation :none <br />User : THM Site :K-Bar-T Pit Filename :M221-02a <br />Agency or organization name: DRMS <br />Permit or other job action :SO <br />Task description :Rip 2.5 acres of compacted areas <br /> <br />HOURLY EQUIPMENT COST <br />Basic machine: Cat D5G XL - 5P Horsepower:- -- 90 <br />Blade type :Power Angle Tilt <br />Attachment no. 1 : ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour: $17.43 NA <br />Dozer operating cost/hour : $30.04 100 <br />Ripper operating cost/hour : $1.93 100 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $87.94 Total fleet cost/hour : $87.94 <br />MATERIAL QUANTITIES <br />Alternate methods - <br />Seismic : <br />Area : <br />NA NA <br />2.50 acres <br />Selected estimating method : Area <br />Load factor : NA Bank volume <br />Rip depth (ft) : 1.50 Volume <br />NA <br />6,050 <br />BCY <br />BCY or CCY <br />Source of estimated quantity :Reclamation Plan <br />Source of estimated load factor : NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity : NA feet/second <br />Unadjusted production : NA cu. yds./hour <br />Unadjusted production <br />per selected method <br />Area : Avg. ripping depth : 1.11 feet/pass <br />Average ripping width : 5.08 feet/pass <br />Average ripping length : 200.00 feet/pass <br />Average dozer speed : 88.00 feet/minute <br />Average maneuver time : 0.25 minutes/pass <br />Site altitude <br />Altitude adjustment <br />Job efficiency factor <br />Net job correction <br />993.42 cu. yds./hour <br />6,570 feet <br />1.00 (Cat HB) <br />0.83 (1 shiflday) <br />0.83 multiplier <br />Production per unit area : 0.555 acres/hour Adjusted unit production : 824.54 <br />Unadjusted production : 993.42 cu. yds./hour Adjusted fleet production : 824.54 <br /> <br />JOB TIME AND COST <br />Fleet size : 1 dozer(s) Total job time <br />Unit cost : $0.107 per cu. yd. Total job cost <br />cu. yds./hour <br />cu. yds./hour <br />7.34 hours <br />$645
The URL can be used to link to this page
Your browser does not support the video tag.