Laserfiche WebLink
Filename : M221-000 <br />County : Rio Blanco <br />Agency or organization name: DRMS <br />Permit or job action : Final Reclamation Cost Estimate - SO-04 <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />01a -Re-Grade 150'Highwall from 1HAV to 3N= ?/ dozer 1 8.0 _ $681 <br />02a -Rip 2.5 acres of compacted areas ripper 1 7.34 $645 <br />03a -Spread 6" of topsoil over 2.5 acres dozer 1 17.0 $1,441 <br />04a -Revegetation of 2.5 acres revege 1 8.0 $2,354 <br />05a -Mobilization mobilize 3 2.6 $1,569 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 43.11 $6,690 <br />o TOTAL DIRECT COST' =L $6,690 <br />"includes inflation factor adjustment of : NA /o <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability insurance : 2.02 % of direct total =_ $135 <br />Performance bond : 1.05 % of direct total = <br />Job superintendent : NA" NA NA total = <br />Profit : 10.00 % of direct total = <br />xru <br />IVA <br />4>ooa <br />not required (or eqp. operator serves as super.) TOTAL O & P = $tt /4 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - CONTRACT AMOUNT (direct + O & P) = $7,564 <br />Financial warranty processing (legal/related costs) : 0.00 total $ NA total = _ ___$0 <br />Engineering work and/or contract/bid preparation : NA NA NA total NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $378 <br />CONTINGENCY - NA' NA total = NA <br />contingencies accounted for at task level TOTAL INDIRECT COST $7,253 <br />TOTAL BOND AMOUNT (direct + indirect) _ $7,943 <br />