Laserfiche WebLink
CIRCES Cost Estimatinq Software <br />EQUIPMENT MOBILIZATION I DEMOBILI2 <br />PROJECT IDENTIFICATION <br />Agency or organization name: DRMS <br />Task # : 05a State : Colorado <br />Date :_1010512009 <br />User: THM <br />Permit/job # : M-1978-221 <br />Abbreviation :none <br />Filename :M221-05a <br />Permit or other job action : So <br />Task description :Mobilization <br /> <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tra ctor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br /> <br />1\VI\-I\V?Vi"IVr ? <br />Machine <br />Description <br />-Cat D5G XL - 5P <br />Weight/unit <br />(Tons) <br />11.78 <br />Ownership <br />Cost/hr/unit <br />$15.72 <br />Haul Rig <br />Cost/hr/unit <br />$88.67 <br />Fleet Size <br />(No. units) <br />1 <br />Haul Trip <br />Cost/hr/fleet <br />$104.39 <br />Return Trip <br />Cost/hr/fleet <br />$88.67 <br />DOT permit <br />Cost/fleet <br />$250.00 <br />-Revegetation Tractor 10.00 $25.00 $88.67 1 $113.67 $88.67 $250.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $218.06 $177.34 $500.00 <br />sheet 1 of 2 <br />County : Rio Blanco <br />Site :K-Bar-T Pit