My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-28_REVISION - M2005050
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2005050
>
2009-09-28_REVISION - M2005050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:20:34 PM
Creation date
10/6/2009 2:57:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005050
IBM Index Class Name
REVISION
Doc Date
9/28/2009
Doc Name
110d amendment application
From
Gault Group Inc.
To
DRMS
Type & Sequence
AM1
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rimrock Exploration & Development, Inc. <br />J-Bird Uranium Mine/ DMO/ EPP <br />Table of Contents <br />List of Figures <br />Figure 1 Vicinity Map <br />Figure 2 Site Map <br />Figure 3 Soil Survey Map <br />Figure 4a Stormwater Control Retention Basin Cross-sections <br />Figure 4b Stormwater Control Diversion Channel and Water Bar Cross section <br />List of Tables <br />Table 1 Recommended Water Quality / Geochemical Analytes for Uranium Mine <br /> DMO Review <br />Table 2 Colorado Stream Classifications <br />Attachments <br />Attachment A SPLP Geochemistry 100ft in due S. vent <br />Attachment B SPLP Geochemistry spot 5-6" deep <br />Attachment C Table 14.1 Sample Analysis Results as Compared to <br />Regulatory Thresholds <br />Attachment D DRMS Minimum Recommended Water Quality Analytes <br />Geochemical and Water Sampling for Existing and Proposed <br />Uranium Mining Operations <br />Attachment E CDPHE CDPS General Permit Application and Certification to <br />Discharge <br />Attachment F Climatic Data <br />Attachment G Soils Survey Tables <br />Attachment H Radiation Monitoring Plan <br />Attachment I Rule 8, Emergency Response Plan <br />Attachment J Rational for Groundwater Evaluation <br />Att. J- Figure 1 <br />Att. J- Figure 2 <br />Att. J- Figure 3 <br />Att. J- Figure 4 <br />Hole Locations <br />Regional Hydrology <br />Generalized Geology Map <br />Hydrogeologic Cross-section <br />iii
The URL can be used to link to this page
Your browser does not support the video tag.