My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-05_REVISION - M1987049 (13)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987049
>
2009-10-05_REVISION - M1987049 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:06:04 PM
Creation date
10/6/2009 8:05:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987049
IBM Index Class Name
REVISION
Doc Date
10/5/2009
Doc Name
Adequacy Review Response Number 2
From
Hart Environmental
To
DRMS
Type & Sequence
AM2
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ideally, for the purpose of calculating the financial warranty the Applicant's preferred <br />option is number 3. The Applicant's representative has discussed this option with Ms. <br />Joanna Williams at the SEO and is exploring the feasibility of obtaining a letter of the <br />type described under option number 3. Unfortunately, it is unlikely that such a letter <br />can be obtained prior to the Division's October 2009 decision date for Bromley Lakes <br />Amendment 002. <br />Therefore, for the purpose of calculating the financial warranty in a timely manner, <br />and only that purpose, the Applicant requests that the Division use option 2 to address <br />possible depletions associated with Phase 18. <br />Regarding Cell 2, the Applicant does not intend to leave any exposed ground water <br />once reclamation is completed (see Applicant's response to item 19 above). The <br />following picture shows wetlands created in a wash fines settling pond that does not <br />contain any exposed ground water. The photograph is of the Marshall Pit wetlands <br />mitigation bank located adjacent to South Boulder Creek. <br />21. " It is the Division's interpretation of the mining plan that a maximum of 40 acres will he <br />disturbed at a time for the remainder of the mining phases and reclamation will be <br />concurrent with mining. Of these 40 acres, there will most likely be various levels of <br />disturbance. Please describe the varying levels of disturbance in terms of acreages• and <br />the steps that would be necessary to reclaim the disturbance. For example. at the point <br />of maximum disturbance, how many acres of land will need to be completely bac?rilled? <br />How many acres will need to be partially hack_filled? How many acres will need to he <br />topsoiled and seeded"? " <br />10/2/2009
The URL can be used to link to this page
Your browser does not support the video tag.