Laserfiche WebLink
topsoil or "growth media" for reclamation. At the time of this inspection no topsoil stockpiles were observed <br />at the site. The Division will need to hold a bond for importing topsoil to cover the 16.20 acres of disturbance <br />which will be a substantial amount. This issue will be addressed during the 112 (c) permitting processes. The <br />operator is encouraged to import growth media to the mine site as soon as possible in order to reduce the <br />necessary bond amount. <br />'J e: t3: %i.f <br />Nov 9 <br />r" . <br />Figure 4.) Stockpile on the west side ol'the Attccted <br />land. <br />application. <br />north end of the pit locking s??uth. <br />Fi('urc -2.) Waste rack stockpile on <br />the AtTectcd Land.