My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-01_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2009-10-01_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:56 PM
Creation date
10/5/2009 3:37:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
10/1/2009
Doc Name
2009 Midterm Reclamation Cost Estimate
From
Jim Stark
To
Joe Dudash
Type & Sequence
MT3
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task # : 027 State : Colorado Permit/job #: C-1996-083 <br />Date : 0912812009 County :Delta Abbreviation :none <br />User : JRS Site: Bowie No. 2 Mine Filename : C083-027 <br />Permit or other job action : 2009 Midterm Review <br />Task description : Haul Rock to Vent Shafts for Disposal <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />?Enuinment Desrrintinn <br />Truck/loader team -Truck : Cat 725 <br />-Loader : CAT 950G <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-Water truck <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader NA NA NA NA <br />% Utilization-machine : 100 52 NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownership cost/hour : $37.08 $22.32 NA NA NA NA <br />Operating cost/hour : $57.53 $19.92 NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $22.29 $38.54 NA NA NA NA <br />Unit subtotals : $116.90 $80.77 NA NA NA NA <br />Number of units : 2 1 0 0 0 0 <br />Group subtotals : Work : $314.57 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $314.57 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,000 LCY factor : NA volume : 2,000 LCY <br />Source of quantity take-off :Operator Estimate <br />Source of estimated swell factor : NA <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis : <br />Material weight : 2,950 pounds/LCY Struck volume : 14.50 LCY <br />Descr.: Traprock - broken Heaped volume : 18.80 LCY <br />Rated payload : 50,000 pounds Average volume : 16.65 LCY <br />Payload capacity : 16.95 LCY Adjusted volume*: 16.95 LCY <br />Final truck volume based on number of loader passes : 16.88 LCY <br />truck volume adjusted to not exceed rated payload or heaped volume <br />Loading Tool Capacity : Job Condition Corrections : Site altitude (ft.) : 7,100 <br />Rated capacity (nom. heaped) : 3.750 LCY Truck Loader Source <br />Descr.: USER-PROVIDED BUCKET FILL FACTOR Altitude adj.: 1.000 1.000 _(Cat H_B) <br />Bucket fill factor : 0.500 Job efficiency : 0.830 0.830 (1 shift/day) <br />Adjusted bucket capacity : 1.875 LCY Net correction : 0.830 0.830 <br />
The URL can be used to link to this page
Your browser does not support the video tag.