Laserfiche WebLink
<br />PROJECT IDENTIFICATION <br />P <br />ermit C <br />-1996-083 S <br />ite: Bowie No. 2 Mi <br />ne <br />Date : 01-Oct-09 S tate : Colorado <br />User: J RS F ilename: C 083-00a C ounty: Delta <br />Agency Nam e: Colorado Division of Reclamation, Mining and Safety <br />Permit Actio n: 2009 Midterm Review <br /> Backfilling and Rough Grading Tasks - Tasks 001-027 <br /> TASK HOURS DIRECT COST <br /> <br />Task Task Description <br /> 10 <br />615 $384,385 <br />001 Pull Back and Haul Portal Bench Fill Material to Cut Slope . <br />157.94 $186,627 <br />002 Regrade D-Portal Bench <br />.56 <br />27 <br />$13 <br />,,801 <br />80 <br />003 Pull Up Material for Utility Corridor 4 48 <br />. $5 <br />297 <br />, <br />004 Regrade Utility Corridor <br />1.73 $2,045 <br />2,0 <br />005 Rip and Regrade Material Storage Area at Gob Pile <br />23.48 $11,759 <br />006 Pull Back Material at Old Truck Loadout Material Storage Area 8 $9, <br />9,694 <br />007 Regrade Old Truck Loadout Material Storage Area 162.92 <br />62.9 $ <br />008 Pull Back Material at Truck Loadout/Coal Stockpile <br />32.39 0 <br />$38 <br />, ,2727 <br />009 Re grade New Truck Loadout and Coal Stockpile 476.64 670 <br />$23 <br />, <br />010 Pull Material Back Onto Train Loadout Facilities and Railbed Benches <br />17171.4.49 $202,640 <br />011 Regrade Train Loadout Facilities and Railbed Benches 5.61 ,631 <br />$6 <br />,631 <br />012 Backfill and Regrade Train Loadout Overland Conveyor Corridor 90.83 <br />,746 <br />$4 <br />013 Haul Fill from Upper Material Storage Area to B-Seam Portal Bench <br />h 10 514 <br />$58, <br />58,51 <br />014 Haul Fill from Adjacent Material Storage Area to B-Seam Portal Benc 105.29 1 ,41 <br />$ <br />015 Backfill and Regrade B-Seam Portal Bench 2.56 $1,281 <br />016 Pull Material Back Onto Freeman Gulch Vent Shaft Bench <br />0 <br />48 $564 <br />5 <br />017 Push Material from Freeman Gulch Vent Shaft Back to Cut Slope 42 <br />8 49 <br />$ <br />9 <br />018 Regrade Freeman Gulch Vent Shaft Pad 68.92 <br />.9 $81,4 <br />019 Regrade Drill Pads from MR's and TR's 0 <br />0.48 $567 <br />567 <br />020 Regrade Material Storage Area from TR-29 36.97 ,686 <br />$4 <br />021 Backfill and Regrade New Prep Plant Bench .66 $873 <br />873 <br />022 Replace Fill from Material Storage Area to Water Tank Bench 19.15 $22,629 <br />023 Regrade Borrow Area 1 $2, <br />,22 <br />024 Regrade Hubbard Creek Vent Shaft Pad 3.66 <br />.66 $ <br />6 <br />025 Regrade Upper Parking Lot Expansion Area 3 $32,928 <br />026 Haul Material from Bowie No. 1 Mine Stockpile to Hubbard Creek Vent Shaft 24.05 <br />,567 <br />$ <br /> 027 Haul Rock to Vent Shafts for Disposal 2,188.76 $1,616,692 <br /> Total Direct Cost <br />jrs