Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task #: 022 State : Colorado Permit/job #:-C-96-083 <br />Date : 0912812009 County:Delta Abbreviation :none <br />User: JRS Site : Bowie No. 2 Mine Filename : C083-022 <br />Permit or other job action :2009 Midterm Review <br />Task description :Replace Fill from Material Storage Area to Water Tank Bench <br />HOURLY EQUIPMENT COST <br />Cost Bre <br />Shift basis : 1 per day <br />Equipment Description <br />Scraper work team -Scraper : Cat 627G w/push-pull <br />-Push dozer: NA <br />Support equipment -Load area : NA <br />-Dump area : NA <br />Road maintenance -Motor grader : NA <br />-Water truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA NA NA <br />% Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $69.94 NA NA NA NA NA <br />Operating cost/hour : $167.91 NA NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $24.98 NA NA NA NA NA <br />Unit subtotals : $262.83 NA NA NA NA NA <br />Number of units : 2 0 0 0 0 0 <br />Group subtotals : Work : $525.66 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $525.66 <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume : 700 CCY factor <br />Source of quantity take-off :Operator Estimate <br />Source of estimated swell factor : CAT Handbook <br />Loose <br />1.165 volume : 816 LCY