2009-10-01_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2009-10-01_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:56 PM
Creation date
10/5/2009 3:37:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
10/1/2009
Doc Name
2009 Midterm Reclamation Cost Estimate
From
Jim Stark
To
Joe Dudash
Type & Sequence
MT3
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION <br />Hauling Capacity : <br />Scraper Payload (weight) Basis : <br />sheet 2 of 2 <br />Scraper Bowl (volume) Basis : <br />Material weight : 2,900 pounds/LCY Struck volume : 15.70 LCY <br />Material description : Heaped volume : 21.00 LCY <br />Decomposed rock - 50% Rock, 50% Earth Average volume : 18.35 LCY <br />Rated payload : 48,000 pounds Adjusted capacity : 16.55 LCY *** <br />Payload capacity: 16.55 LCY hourly production reflects volume per scraper pair on push-pull models <br />Cycle Time : <br />Scraper loading time * : 0.90 minutes <br />Maneuver and spread time : 0.60 minutes <br />* load time per scraper pair on push-pull models <br />Travel time : <br />Road condition description :Firm, smooth, rolling <br />Job Condition Corrections : Site altitude (ft.) : 6, 750 <br />Scraper Push dozer Source <br />Altitude adj.: 1.000 NA (Cat HB) <br /> Job efficiency : 0.830 NA (Cat HB) <br />Net correction : 0.830 NA <br />dirt/It. surfaced, watered, maintained <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)** <br />1 800 0.00 3.00 3.00 2824 0.52 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : 0.52 minutes <br />__F874 0.40 <br />t S <br />" travel time for each segment is adjusted for acceleration/deceleration. Keturn time : v.vv minu e <br /> <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 2.43 minutes <br />Unadjusted unit production/hour : 819.02 LCY/hour *** Adjusted for job conditions : 679.79 LCY/hour <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 2 scraper(s) <br />Adjusted single scraper team (unit) hourly production : 679.79 LCY/hour <br />Adjusted multiple scraper team (fleet) hourly production : 679.79 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) <br />Unit cost : $0.773 /LCY <br />Total job time : 90.83 Hours <br />Total job cost : $47,746