Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task #: 003 <br />Date : 0912812009 <br />User: JRS <br />CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />State : Colorado Permit/job # : C-96-083 <br />County :Delta Abbreviation :none <br />Site :Bowie No. 2 Mine Filename: C083-003 <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action 2009 Midterm Review _._ _ -- <br />Task description :Pull Up Material for Utility Corridor <br />HOURLY EQUIPMENT COST <br />Machine description :Cat 365E L Series 11(2005) Horsepower : 404 <br /> Weight (MT) : 70.25 <br />Cost Breakdown : Utilization % <br />Ownership cost/hour : $75.87 NA Shift basis : 1 per day <br />Operating cost/hour : $135.77 100 Data source (CRG) <br />Operator cost/hour : $38.72 NA <br />Total unit cost/hour : $250.37 Total fleet cost/hour : $500.73 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />490 CCY factor : 1.165 volume : <br />volume : 11 13,386 LCY <br />, <br />Source of estimated volume: Page 3.02-2 <br />Source of estimated swell factor : CAT Handbook <br /> <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket swing loaded dump bucket swing empty) <br />Basic job condition description : SEVERE <br />Secondary job condition within basic description : SEVERE <br />Cycle time value : 0.57 minutes <br /> <br />Bucket Capacity <br />Rated bucket capacity : 3.27 LCY (heaped) Bucket size class : small <br />Bucket fill factor : 0.85 Hard, tough clay (80% - 90%) <br />Adjusted bucket capacity : 2.78 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 6,500 feet Altitude adjustment : 1.00 (Cat HB) _ <br />Job efficiency adjustment : 0.83 (1 shif1day)_ <br />Net job correction : 0.83 multiplier <br /> <br />Unadjusted hourly unit production : 292.58 LCY/hour <br />Adjusted hourly unit production : 242.84 LCY/hour <br />Adjusted hourly fleet production : 485.68 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 2 excavator(s) Total job time : 27.56 hours <br />Unit cost : $1.031 per LCY Total job cost : $13,801 <br />