Laserfiche WebLink
PROJECT IDENTIFICATION <br />Permit <br />C-1996-083 <br />Site: Bowie No. 2 Mine <br />Date : 01-Oct-09 State : Colorado <br />User: JRS Filename: C083-00h County: Delta <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: 2009 Midterm Review <br />Topsoil Replacement Tasks - Tasks 110-131 <br /> TASK HOURS DIRECT COST <br />Task Task Description <br />110 Replace Topsoil from Stockpile A to Portal/Utility Area 670.39 $352,398 <br />111 Replace Topsoil from Stockpile A to Truck Loadout/Coal Stockpile Area 43.81 $23,031 <br />112 Replace Topsoil from Stockpile F to Train Loadout 41.44 <br />12 <br />90 $21,783 <br />374 <br />$47 <br />113 Replace Topsoil from Stockpile A to B-Seam Portal Bench . <br />91 , <br />074 <br />$1 <br />114 Replace Topsoil from Stockpile to Freeman Gulch Vent Shaft Pad 0. , <br />115 Replace Topsoil from Stockpiles C and D to Pond C and Gob Pile Pond 13.47 <br />72 <br />5 $7,080 <br />295 <br />$1 <br />116 Replace Topsoil from Stockpile to Pond F . <br />2.94 , <br />$1,546 <br />117 Replace Topsoil from Stockpile F to Pond J 1.98 $1,039 <br />118 Replace Topsoil from Stockpile F to Pond K <br />' 02 <br />22 019 <br />$26 <br />119 s <br />Replace Topsoil from Stockpile to Light-Use Roads from MR's and TR . , <br />120 Replace Topsoil from Stockpile to Drill Pads from MR's and TR's 26.57 $31,401 <br />121 Replace Topsoil from Stockpile A to Prep Plant Bench 23.07 $12,127 <br />$216 <br />122 Replace Topsoil from Stockpile to Material Storage Area 0.18 <br />29.62 $15,571 <br />123 Replace Topsoil from Stockpile E to Gob Pile #2 98.62 $51,843 <br />124 Replace Topsoil from Stockpile to Gob Pile #2 137.09 $72,064 <br />125 Replace Topsoil from Stockpile to Gob Pile #3 0.17 $198 <br />126 Replace Topsoil from Stockpile to Haul Road 1 <br />76 $924 <br />127 Replace Topsoil from Stockpile to Water Tank Bench . <br />15 <br />5 710 <br />$2 <br />128 Replace Topsoil from Stockpile G to TR-35 Drill Pad and Light-Use Road . , <br /> 5.44 $6,433 <br />129 Replace Topsoil from Stockpile to Borrow Area 44 <br />0 $129 <br />130 Replace Topsoil from Stockpile to Upper Parking Lot Expansion . <br />74 <br />0 $873 <br />131 Replace Topsoil from Stockpile to Hubbard Creek Vent Shaft Pad . <br /> <br /> <br /> <br /> <br /> 1,221.65 $677,128 <br /> Total Direct Cost <br />jrs <br />01-10-09