Laserfiche WebLink
-4- <br />12. Primarv future (Post-mining) land use (check one): <br />Cropland(CR) _ Pastureland(PL) General Agriculture(GA) <br />? Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br />Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br />Developed Water Resources(WR) Solid Waste Disposal(WD) <br />13. Primary present land use check one : <br />Cropland(CR) L?j Pastureland(PL) General Agriculture(GA) <br />?? Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br />Residential(RS) j6j Recreation(RC) Industrial/Commercial(IC) <br />Developed Water Resources(WR) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Mining will take place via front-end loader, track hoe and truck. <br />15. On Site Processing: F-1 Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />Mining will take place via front-end loader, track hoe and truck. <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s).