My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-05_PERMIT FILE - M2009078
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009078
>
2009-10-05_PERMIT FILE - M2009078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:59 PM
Creation date
10/5/2009 1:05:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009078
IBM Index Class Name
PERMIT FILE
Doc Date
10/5/2009
Doc Name
New 112c application
From
Elam Construction, Inc.
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Species Lbs Pure Live Seed per acre <br />Slender wheatgrass 3 <br />Basin Wildrye 1.5 <br />Inland Saltgrass 1 <br />Alkali Sacaton I <br />Common Reedgrass 0.5 <br />Canadian Reedgrass 0.2 <br />Skunkbush Sumac 0.4 <br />Northern Sweetvetch 0.5 <br />Orchardgrass 0.5 <br />Western Wheatgrass 0.1 <br />Total 8.7 <br />Seeding will normally be done during the fall when temperatures are cooler. Straw mulch will be <br />used, (certified "weed free") and applied at a rate of 2,000 pounds per acre and either crimped or <br />"tackified" at 150 pounds per acre. The mulch will only be used in the dryland areas. No mulch <br />will be used in the wetland areas. <br />6. Post-Reclamation Site Drainage <br />The entire mining area will drain to the lake after reclamation, as shown on Map F-1. <br />7. Weed Control <br />Measures will be employed for control of any noxious weed species. A Weed Control Plan will <br />be utilized as follows: <br />1) Each April, a weed survey will be made of the permit area. <br />2) If any patches or plants have been identified, they will be sprayed by backpack sprayer or <br />4-wheeler using chemicals approved for use by the weed control staff of Moffat County. <br />3) After reclamation, weed surveys and spraying will continue until the perennial cover and <br />production of the site have met DRMS requirements and bond release has been obtained. <br />Gehrman Pit October 09 E-4
The URL can be used to link to this page
Your browser does not support the video tag.