Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : X03 State :Colorado Permit/job# :X-1988-168-22 <br />Date : 1010112009 County :Routt Abbreviation :none <br />User : JDM Site : Yoast/Seneca Filename :X-22-X03 <br />Agency or organization name : CDRMS <br />Permit or other job action : SL01 <br />Task description :Retopsoi/ Monitoring Well Pads <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series 11- 8SU (200,1 Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $54.99 NA <br /> Operating cost/hour : $90.98 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $184.50 Total fleet cost/hour : $184.50 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 246 BCY factor : 1.250 volume : 308 LCY <br />Source of estimated volume: Division Estimate <br />Source of estimated swell factor :Operator Estimate -7 77 7 7--7--77 <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (a vg.) <br />Average push distance : 50 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 1,400.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) _ <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-r? <br /> Push gradient : 0.90 (Cat HB) <br />Average push gradient : 5.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,500 feet Material weight : 0.87 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,650 Ibs/LCY Net correction : 0.39 <br />Weight description : <br />Decomposed rock - 25% Rock, 75% Earth Adjusted unit production : 546.56 LCY/hr <br /> Adjusted fleet production : 546.56 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 0.56 Hours <br />Unit cost : $0.338 /LCY Total job cost : $104