My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-30_REPORT - M1990106
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1990106
>
2009-09-30_REPORT - M1990106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 10:24:46 AM
Creation date
10/1/2009 1:42:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990106
IBM Index Class Name
REPORT
Doc Date
9/30/2009
Doc Name
Annual Fee/Report/Map
From
RBK Construction
To
DRMS
Permit Index Doc Type
Annual Fee/Report
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. <br />Permittee Name: <br />Permit No. <br />Notice of Intent to continue Mining Operations <br />jQ C Construction Materials Annual Report <br />RBK Construction, :>=nc. <br />M-1990-106 <br />Operation Name: RBK Pit No. 30 <br />Anniversary Date: 10-16-09 <br />Total: $323.00 1. a. Permitted acreage: . 9 9 b. County where mine is located: Pueblo <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? YES NO <br />Does. the mine operate MORE or LESS than 180. days per year? MORE LESS <br />3. Does this mine have a phased reclamation plan? YES NO <br />4. Total acres affected during the report year:* <br />5. Total acres reclaimed for the report year:* 6. Total number of acres in topsoil replacement stage: <br />a. Average thickness of topsoil replaced: <br />7. Total number of acres seeded: <br />a. List species.seeded & seeding rate for report year on back <br />8. For non-phased operations provide dates extraction ceased: <br />a. Date reclamation began: <br />9. The type and approximate quantity of fertilizers; organic material or soil conditioners <br />used for the report year:* <br />10. Estimated total acres to be affected in the-next report year:* <br />11. COMMENTS: No change Sinn-P last man or nnniial ippnrt <br />* Please show the location of the acreage for items 4 - 6 on your map**. Indicate the phases of the reclamation <br />which have been completed, correlated with your timetable. For phased operations show dates extraction <br />ceased and dates reclamation began. . <br />** NOTE: If ther a e not been any changes since the last annual report and you previously submitted a map <br />which correctly V pic the current a eage m ms 2 hrough 6, then a new map is unnecessary. However, this <br />must be stated Wove/ . A <br />Signatu???/ Y1! YX?if dir. Date: ?S- G9 <br />Please type or pri t current ontac name, mailing address, and phone number below: <br />Contact Name: Ro - Neume.ister Phone: (719) 489-3385 <br />Company: RBK Construction, Inc. FAXNO: (719) 489-9969 <br />Address: P.O. Box 387 <br />Rye, CO 81069 <br />Federal Tax ID No. or Social Security No.: R 4- 0 g R 9 9 R R
The URL can be used to link to this page
Your browser does not support the video tag.