Laserfiche WebLink
Table 2 <br />Logan Sand and Gravel Mine <br />Operational Losses <br />Percent of Total <br />Annual Amount of Water Lost Operational Total Evaporative <br />Aggregate Aggregate with Mined Water Used for Losses from and Operational <br />Month Production Production Aggregate Dust Control Pits Losses <br /> (tons) (acre-feet) (acre-feet) (acre-feet) (acre-feet) <br />[7] [8] [9] [10] [11] [12] <br />Jan-09 0.0% 0 0.00 0.00 0.00 0.48 <br />Feb-09 0.0% 0 0.00 0.00 0.00 0.59 <br />Mar-09 5.5% 2,750 0.08 0.09 0.17 0.97 <br />Apr-09 9.0% 4,500 0.13 0.09 0.22 1.59 <br />May-09 13.0% 6,500 0.19 0.09 0.28 1.87 <br />Jun-09 16.5% 8,250 0.24 0.09 0.33 2.35 <br />Jul-09 18.0% 9,000 0.26 0.09 0.36 2.61 <br />Aug-09 15.0% 7,500 0.22 0.09 0.31 2.37 <br />Sep-09 11.0% 5,500 0.16 0.09 0.25 1.85 <br />Oct-09 8.0% 4,000 0.12 0.09 0.21 1.28 <br />Nov-09 4.0% 2,000 0.06 0.09 0.15 0.77 <br />Dec-09 0.0% 0 0.00 0.00 0.00 0.49 <br />Total 100.0% 50,000 1.47 0.83 2.30 17.23 <br /> <br /> Percent of Total <br /> Annual Amount of Water Lost Operational Total Evaporative <br /> Aggregate Aggregate with Mined Water Used for Losses from and Operational <br />Month Production Production Aggregate Dust Control Pits Losses <br /> (tons) (acre-feet) (acre-feet) (acre-feet) (acre-feet) <br />Jan-10 0.0% 0 0.00 0.00 0.00 0.48 <br />Feb-10 0.0% 0 0.00 0.00 0.00 0.59 <br />Mar-10 5.5% 2,750 0.08 0.09 0.17 0.97 <br />Apr-10 9.0% 4,500 0.13 0.09 0.22 1.59 <br />May-10 13.0% 6,500 0.19 0.09 0.28 1.87 <br />Jun-10 16.5% 8,250 0.24 0.09 0.33 2.35 <br />Jul-10 18.0% 9,000 0.26 0.09 0.36 2.61 <br />Aug-10 15.0% 7,500 0.22 0.09 0.31 2.37 <br />Sep-10 11.0% 5,500 0.16 0.09 0.25 1.85 <br />Oct-10 8.0% 4,000 0.12 0.09 0.21 1.28 <br />Nov-10 4.0% 2,000 0.06 0.09 0.15 0.77 <br />Dec-10 0.0% 0 0.00 0.00 0.00 0.49 <br />Total 100.0% 50,000 1.47 0.83 2.30 17.23 <br />Notes: <br />[7] Based on information from Reese <br />[8] Equals Column [7] x # tons/yr. <br />[9] Equals Column [8] x 2000 x 0.04/62.4/43,560. <br />[10] Equals 1500 gal/day x number of operating days (20 days)/325851, during production months <br />[11] Equals Column [9] + Column[10]. Dust control water is pumped from open pits. <br />[12] Total Evaporative and Operational depleitons. Column[6], Table 1 + Column [11] <br />Reese <br />8/25/2009 Logan Sand Gravel 09-10 SWSP Reese 09 SWSP 09 08 013.xls