Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICAT N ..G <br />Task #: 196 p 2'¢ <br />Date : 09127120 <br />User <br />TAK <br />State : Colorado <br />County : Gunnison <br />Site :West Elk Mine <br />Permit/job #: C-80-007 <br />Abbreviation :none <br />Filename : &007-196 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And <br />Permit or other job action : Permit Renewal RN-03 <br />Task description :Finish grade ROM Pile Expansion <br />HOURLY EQUIPMENT COST <br />Basic machine : CAT 14H <br />Attachment no. 1 :NA <br />Attachment no. 2 :Multi-shank ripper <br />Horsepower : 215 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Source of estimated acreage :Map 53 <br />HOURLY PRODUCTION <br />Selected application :Finish grading (0-2.5 mph) <br />Average grader speed : 1.25 mph <br />Selected blade angle : 30 degrees <br />Effective blade length : 12.10 feet <br />Width of blade overlap per pass : 2.00 feet <br />Net grading or ripping width per pass : 10.10 feet " <br />Unadjusted hourly unit production : 1.5303 acres/hour <br />* at 0 degrees, blade is perpendicular <br />to direction of travel. <br />** width of ripper beam on ripping applications <br />Job Condition Correction Factors Source <br />Average site altitude : 6,280 feet Altitude adjustment factor 1.00 (Cat HB) <br />Job efficiency adjustment factor : 0.85 (1sh1d, mod.) <br />Net job correction : 0.8500 multiplier