My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-09_PERMIT FILE - C1980007 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2009-06-09_PERMIT FILE - C1980007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:29 PM
Creation date
10/1/2009 9:54:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
6/9/2009
Section_Exhibit Name
Exhibit 53 Reclamation Cost Estimate Part 2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2 : 3-shank ripper <br />Data source : (CRG) <br />Alternate methods - <br />Seismic : NA NA Load factor <br />Area : 6.50 <br />acres Rip depth (ft) <br />NA Bank volume <br />2.00 Volume <br />NA BCY <br />20,973 BCY or CCY <br />Source of estimated quantity : TR-58; Map 53 <br />Source of estimated load factor : NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity : NA feet/second <br />Unadjusted production : NA cu. yds./hour <br /> <br />Area : Avg. ripping depth : 2.00 feet/pass <br />Average ripping width : 7.67 feet/pass <br />Average ripping length : 200.00 feet/pass <br />Average dozer speed : 88.00 feet/minute <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.838 acres/hour <br />Unadjusted production : 2,702.54 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 4 dozer(s) <br />Unadjusted production <br />per selected method <br />Site altitude <br />Altitude adjustment <br />Job efficiency factor <br />Net job correction <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />2, 702.54 cu. yds./hour <br />6,300 feet <br />1.00 (Cat HB) <br />0.83 (1 shift/day) <br />0.83 multiplier <br />2,243.11 cu. yds./hour <br />8,972.44 cu. yds./hour <br />2.34 hours <br />Unit cost : $0.095 per cu. yd. Total job cost : $1,983
The URL can be used to link to this page
Your browser does not support the video tag.