My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-06-09_PERMIT FILE - C1980007A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2009-06-09_PERMIT FILE - C1980007A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:29 PM
Creation date
10/1/2009 9:54:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
6/9/2009
Section_Exhibit Name
Exhibit 53 Reclamation Cost Estimate Part 3
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2:3-shank ripper <br />Shiftbasis : 1 per day <br />Source of estimated volume: Division estimate <br />Source of estimated swell factor : CAT Handbook <br />....................... :.... <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Operator skill : 0.75 (avg.) <br />Average push distance : 75 feet <br />Unadjusted hourly production : 1,514.3 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient <br />Average site altitude <br />0.00 % (pos) <br />7,100 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />1.10 (Cat HB) <br />1.00 (gen.) <br />1.00 (avg.) <br />0.83 (1shift1day) <br />0.80 (fnd-rf) <br />1.00 (Cat HB) <br />1.00 (Cat HB) <br />0.79 (Cat HB) <br />1.00 (S/SU/U) <br />0.43 <br />657.67 <br />2,630.67 <br />LCY/hr <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) Total job time : 0.00 Hours <br />Unit cost : $0.311 /LCY Total job cost : $3
The URL can be used to link to this page
Your browser does not support the video tag.