Laserfiche WebLink
Mr. Allen Sorenson, DRMS 3/6/2009 <br />B. Unnamed Gulch (SW-2) <br />- June 28, 2007, Notes: No water at sampling location. <br />- September 12. 2007, Notes: No water at sampling location. <br />- November 19, 2007, Notes: No water at sampling location. <br />- March 11, 2008, Notes: No water at sampling location. <br />- June 18, 2008, Notes: No water at sampling location. <br />- September 15, 2008, Notes: No water at sampling location. <br />- December 17, 2008, Notes: No water at sampling location. <br />Page 2 of 4 <br />Per the Technical Revision, 5 samples have not been able to be taken due to the <br />ephemeral nature of water flow at this sampling location. No baseline can be established <br />at this time. <br />Ground Water Monitoring <br />C. Ungradient Well (MW-1) <br />September 12, 2007, Notes: Sampled prior to well completion. Data in Table 2. <br />September 27. 2007, Notes: DL Drilling completed well. <br />November 19, 2007, Notes: Sampled newly completed well with new bailer. Data in <br />Table 2. <br />March 11, 2008, Notes: Data in Table 2. <br />- June 18, 2008, Notes: Data in Table 2. <br />September 15, 2008, Notes: Data in Table 2. <br />- December 17, 2008, Notes: Sample taken, data pending. <br />Five quarters of water monitoring data are available. A proposed baseline is presented in <br />Table 2. <br />D. Cash Mine Pool (CW) <br />March 30, 2007, Notes: Data in Table 3. <br />June 27, 2007, Notes: Data in Table 3. <br />September 12. 2007, Notes: Data in Table 3. <br />November 19, 2007, Notes: Data in Table 3. <br />March 11, 2008, Notes: Data in Table 3. <br />June 18, 2008, Notes: Data in Table 3. <br />September 15, 2008, Notes: Data in Table 3. <br />December 17, 2008, Notes: Sample taken, data pending. <br />Five quarters of water monitoring data are available. A proposed baseline for the Cash <br />Mine Pool (CW) is presented in Table 3. <br />2007-8 Mine Water.doc