Laserfiche WebLink
CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : CDRMS <br />Task #: 311 State : Colorado <br />Date : 0311312009 County : Gunnison <br />User : TAK Site: West Elk Mine <br />Permit or other job action :Midterm Review 6 <br />Task description : Haul Shaft #3 backrill from Shafts #1 and #2 (Task #228, PR-7) <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />?Fniiinmcn4 rlccrrin4inn <br />Truck/loader team -Truck :Generic 10-12 cy, 6x4 <br />-Loader : CAT 966G <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-Water truck <br />sheet 1 of 2 <br />D9R - 9SU <br />D9R - 9SU <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer NA NA <br />% Utilization-machine : 92 100 100 100 NA NA <br />-Ripper attachment : NA NA 0 0 NA NA <br />Ownership cost/hour : $16.52 $28.46 $51.07 $51.07 NA NA <br />Operating cost/hour : $20.06 $30.02 $93.97 $93.97 NA NA <br />Ripper op. cost/hour : NA NA $0.00 $0.00 NA NA <br />Operator cost/hour : $21.72 $31.83 $31.83 $31.83 NA NA <br />Unit subtotals : $58.30 $90.31 $176.87 $176.87 NA NA <br />Number of units : 6 1 1 1 0 0 <br />Group subtotals : Work : $440.10 Support : $353.73 Maintenance : $0.00 <br />Total work team cost/hour <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 151,000 BCY factor : 1.330 volume <br />Source of quantity take-off :Operator estimate <br />Source of estimated swell factor :CAT Handbook <br />Material purchase cost : $0.00 /LCY <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Total cost <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis : <br />Material weight : 2,900 pounds/LCY Struck volume : <br />Descr.: Decomposed rock - 50% Rock, 50% Earth Heaped volume : <br />Rated payload : 35,400 pounds Average volume : <br />Payload capacity : 12.21 LCY Adjusted volume': <br />Final truck volume based on number of loader passes <br />truck volume adjusted to not exceed rated payload or heaped volume <br />10.00 LCY <br />12.00 LCY <br />11.00 LCY <br />12.00 LCY <br />8.55 LCY <br />Loadinq Tool Capacity : Job Condition Corrections : Site altitude (ft.) <br />Rated capacity (nom. heaped) : 4.750 LCY Truck Loader <br />Descr.:Other. - soil, boulders, roots (80 -100%) Altitude adj.: 1.000 0.920 <br />Bucket fill factor : 0.900 Job efficiency : 0.830 0.830 <br />Adjusted bucket capacity: 4.275 LCY Net correction : 0.830 0.764 <br /> <br />Permit/job #: C-80-007 <br />Abbreviation :none <br />Filename :0007-311 <br />$793.83 <br />200,830 LCY <br />$0 <br />6,300 <br />Source <br />'Cat HB)