Laserfiche WebLink
PROJECT IDENTIFICATION <br />CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />Task # : - 6ok- Z/ Q State : Colorado <br />Date : 0511412009 County :Gunnison <br />User : TAK Site : West Elk Mine <br />Permit/job #: C-80-007 <br />Abbreviation :none <br />Filename :0007-54r <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :MR-354 <br />Task description : Rip road and auger rig drill sites <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br />Cost Breakdown : Ownership cost/hour : <br />Dozer operating cost/hour : <br />Ripper operating cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour <br />MATERIAL QUANTITIES <br />Utilization % <br />$72.92 NA <br />$98.84 100 <br />$7.51 100 <br />$32.78 NA <br />$212.05 Total fleet cost/hour : $848.19 <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : <br />Area : <br />NA NA <br />0.60 acres <br />Load factor : NA Bank volume <br />Rip depth (ft) : 1.00 Volume <br />NA <br />968 <br />BCY <br />BCY or CCY <br />Source of estimated quantity :MR-352 submittal, Table 2 <br />Source of estimated load factor : NA <br />HOURLY PRODUCTION <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity: NA feettsecond Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 2,083.21 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 2.00 feet/pass Site altitude : 8,000 feet <br />Average ripping width : 7.67 feet/pass Altitude adjustment : 0.95 (Cat HB) <br />Average ripping length : 50.00 feet/pass Job efficiency factor : 0.83 (1 shif1day) <br />Average dozer speed : 88.00 feet/minute Net job correction : 0.79 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.646 acres/hour Adjusted unit production : 1,642.61 cu. yds./hour <br />Unadjusted production : 2,083.21 cu. yds./hour Adjusted fleet production : 6,570.44 cu. yds./hour <br /> <br />JOB TIME AND COST <br />Fleet size : 4 dozer(s) Total job time : 0.15 hours <br />Unit cost : $0.129 per cu. yd. Total job cost : $125 <br />