Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimatina Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name: CDRMS <br />Task #: 7 fz -996- State : Colorado Permit/job # : C-80-007 <br />Date : 1213012008 County:Gunnison Abbreviation :none <br />User:- TAK Site : West Elk Mine Filename :0007-098 <br />Permit or other job action : Midterm Review 6 <br />Task description :Replace topsoil from stockpile to RPE ponds <br />HOURLY EQUIPMENT COST Shift basis <br />Equipment Description <br />Truck/loader team -Truck : Generic 10-12 cy, 6x4 <br />-Loader : CAT 966G <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-Water truck <br />D9R - 9SU <br />D9R - 9SU <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer NA NA <br />% Utilization-machine : 100 96 100 100 NA NA <br />-Ripper attachment : NA NA 0 0 NA NA <br />Ownership cost/hour : $16.52 $28.46 $51.07 $51.07 NA NA <br />Operating cost/hour : $21.86 $28.73 $93.97 $93.97 NA NA <br />Ripper op. cost/hour : NA NA $0.00 $0.00 NA NA <br />Operator cost/hour : $21.72 $31.83 $31.83 $31.83 NA NA <br />Unit subtotals : $60.10 $89.03 $176.87 $176.87 NA NA <br />Number of units : 4 1 1 1 0 0 <br />Group subtotals : Work : $329.42 Support : $353.73 Maintenance : $0.00 <br />Total work team cost/hour : <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,388 CCY factor : 1.125 volume : <br />Source of quantity take-off : TR-79; DRMS estimate <br />Source of estimated swell factor : CAT Handbook <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis : <br />Material weight : 2,550 pounds/LCY Struck volume : 10.00 LCY <br />Descr.: Earth - Dry packed Heaped volume : 12.00 LCY <br />Rated payload : 35,400 pounds Average volume: 11.00 LCY <br />Payload capacity: 13.88 LCY Adjusted volume': 12.00 LCY <br /> Final truck volume based on number of loader passes : 8.55 LCY <br /> `truck volume adjusted to not exce ed rated payload or heaped volume <br />Loading Tool Capacity : Job Condition Corrections : Site altitude (ft.): --6,300 <br />Rated capacity (nom. heaped) : 4.750 LCY Truck Loader Source <br />Descr.: Other - soil, boulders, roots (80 -100916) Altitude adj.: 1.000 0.920 (Cat HB) <br />Bucket fill factor : 0.900 Job efficiency : 0.830 0.830 (1 shift/day) <br />Adjusted bucket capacity: 4.275 LCY Net correction : 0.830 0.764 <br />$683.16 <br />2.686 LCY