Laserfiche WebLink
CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name: CDRMS <br />Task #: O 8( -638- State : Colorado <br />Date : 1212212008 County : Gunnison <br />User : TAK Site : West Elk Mine <br />Permit or other job action : Midterm Review 6 <br />sheet 1 of 2 <br />Task description : Haul Bear Mine area riprap stockpile to base of rill <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />Equipment Description <br />Truck/loader team -Truck : Generic 10-12 cy, 6x4 <br />-Loader : CAT 966G <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-Water truck <br />D9R - 9SU <br />D9R - 9SU <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer NA NA <br />% Utilization-machine : 100 94 100 100 NA NA <br />-Ripper attachment : NA NA 0 0 NA NA <br />Ownership cost/hour : $16.52 $28.46 $51.07 $51.07 NA NA <br />Operating cost/hour : $21.86 $28.32 $93.97 $93.97 NA NA <br />Ripper op. cost/hour : NA NA $0.00 $0.00 NA NA <br />Operator cost/hour : $21.72 $31.83 $31.83 $31.83 NA NA <br />Unit subtotals : $60.10 $88.61 $176.87 $176.87 NA NA <br />Number of units : 2 1 1 1 0 0 <br />Group subtotals : Work : $208.81 Support : $353.73 Maintenance : $0.00 <br />Total work team cost/hour : $562.54 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,852 LCY factor : NA volume : 1,852 LCY <br />Source of quantity take-off : DRMS estimate <br />Source of estimated swell factor : CAT Handbook <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis : <br />Material weight : 2,550 pounds/LCY Struck volume : 10.00 LCY <br />Descr.: Sandstone Heaped volume : 12.00 LCY <br />Rated payload : 35,400 pounds Average volume : 11.00 <br />Payload capacity : 13.88 LCY Adjusted volume': 12.00 <br /> Final truck volume based on number of loader passes : 11.88 <br /> 'truck volume adjusted to not exceed rated payload or heaped volume <br />Loading Tool Capacity : Job Condition Corrections : Site altitude (ft.) <br />Rated capacity (nom. heaped) : 4.750 LCY Truck Loader <br />Descr.: USER-PROVIDED BUCKET FILL FACTOR Altitude adj.: 1.000 0.920 <br />Bucket fill factor : 0.500 Job efficiency : 0.830 0.830 <br />Adjusted bucket capacity : 2.375 LCY Net correction : 0.830 0.764 <br /> <br />Permitljob #: C-80-007 <br />Abbreviation :none <br />Filename :0007-038 <br />LCY <br />LCY <br />LCY <br />6,300 <br />Source <br />(Cat HB) <br />shift/day)