Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimatinci Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task # : 074-040- State : Colorado Permit/job #: C-80-007 <br />Date : 1212312008 County : Gunnison Abbreviation :none <br />User : TAK Site : West Elk Mine Filename :0007-040 <br />Permit or other job action : Midterm Review 6 <br />Task description :Distribute Main Topsoil Stockpile <br />HOURLY EQUIPMENT COST <br />Shiftbasis : 1 per day <br />(Equipment Description <br />Cost Bre <br />Scraper work team -Scraper : Cat 637G w/push-pull <br />NA <br />-Push dozer: <br />Support equipment -Load area : Cat D9R - 9SU (2005) <br />-Dump area : NA <br />Road maintenance -Motor grader : NA <br />-Water truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA dozer NA NA NA <br />% Utilization-machine : 100 NA 100 NA NA NA <br />-Ripper attachment : NA NA 10 NA NA NA <br />Ownerhip cost/hour : $110.37 NA $62.35 NA NA NA <br />Operating cost/hour : $177.86 NA $103.27 NA NA NA <br />Ripper op. cost/hour : NA NA $0.00 NA NA NA <br />Operator cost/hour : $24.95 NA $32.78 NA NA NA <br />Unit subtotals : $313.18 NA $198.40 NA NA NA <br />Number of units : 4 0 1 0 0 0 <br />Group subtotals : Work : $1,252.71 Support: $198.40 Maintenance : $0.00 <br />Total work team cost/hour : $1,451.11 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 84,800 LCY factor : NA volume : 84,800 LCY <br />Source of quantity take-off : Table 36 - Approximate Topsoil Stockpile Volumes <br />Source of estimated swell factor : NA