Laserfiche WebLink
CIRCES Cost Estimatina Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name: Colorado Division Of Reclamation, Mining And Safety <br />Task #: 014 State : Colorado Permit/job #: C-80-007 <br />Date : 0411312009 County: Gunnison Abbreviation :none <br />User : TAK Site : West Elk Mine Filename : 0007-014 <br />Permit or other job action :Midterm Review 6 <br />Task description : Haul coal at new stacking tube to refuse pile <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />Equipment Description <br />Truck/loader team -Truck : Generic 10-12 cy, 6x4 <br />-Loader : CAT 966G (2002) <br />Support equipment -Load area : Cat D9R - 9SU (2005) <br />-Dump area : Cat D9R - 9SU (2005) <br />Road maintenance -Motor grader <br />-Water truck <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer NA NA <br />% Utilization-machine : 96 100 100 100 NA NA <br />-Ripper attachment : NA NA 0 0 NA NA <br />Ownership cost/hour : $12.32 $29.49 $62.35 $62.35 NA NA <br />Operating cost/hour : $42.23 $40.39 $103.27 $103.27 NA NA <br />Ripper op. cost/hour : NA NA $0.00 $0.00 NA NA <br />Operator cost/hour : $21.72 $32.78 $32.78 $32.78 NA NA <br />Unit subtotals : $76.27 $102.66 $198.40 $198.40 NA NA <br />Number of units : 4 1 1 1 0 0 <br />Group subtotals : Work : $407.73 Support: $396.80 Maintenance : $0.00 <br />Total work team cost/hour <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 82,253 LCY factor : NA volume <br />Source of quantity take-off :Map 53; TR-65 <br />Source of estimated swell factor : CAT Handbook <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis : <br />Material weight : 1,600 pounds/LCY Struck volume : 10.00 LCY <br />Descr.: Coal - Bituminous, Raw Heaped volume : 12.00 LCY <br />Rated payload : 35,400 pounds Average volume : 11.00 LCY <br />Payload capacity: 22.12 LCY Adjusted volume*: 12.00 LCY <br /> Final truck volume based on number of loader passes : 8.55 LCY <br /> truck volume adjusted to not exce ed rated payload or heaped volume <br />Loading Tool Capacity : Job Condition Corrections : Site altitude (ft.): 6,300 <br />Rated capacity (nom. heaped) : 4.750 LCY Truck Loader - <br />Source <br />Descr.:Other - soil, boulders, roots (80 -100%) Altitude adj.: 1.000 0.920 (Cat HB) <br />Bucket fill factor : 0.900 Job efficiency : 0.830 0.830 (1 shift/day) <br />Adjusted bucket capacity: 4.275 LCY Net correction : 0.830 0.764 <br />sheet 1 of 2 <br />$804.53 <br />82,253 LCY