Laserfiche WebLink
Demolition Work <br />Page 1 of 1 Page 1 of <br />Protect Identification <br /> Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />Task M 601 Permit4ob#: C-80-007 <br />Date: 412712009 Abbreviation: N/A <br />User: TAK Site: West Elk Mine Filename: <br />Permitting action: Midterm 6 (2009) Source of unit costs: CIRCES <br />Task description: Demolish and remove all structures in Deer Creek/Minnesota Creek area Location adjustment: 92.32% <br /> Last unit cost update: 7/1/2007 7/112007 <br />STRUCTURE or ITEM DESCRIPTION QUANTITY UNIT CIRCES DEMOLITION MENU SELECTION 41T COST TOTAL COST % LIAB. TOTAL COST <br /> ft ft ft If in (100% LIAB) <br />Deer Creek Shaft fence (TR-109) 700 700 LF Fencing, chain link - to 6 ft. high $1.9200 $1,344.00 100% $1,344.00 <br />Deer Creek Vent Shaft housing (TR-109) <br />Superstructure 30 30 10 9,000 CF Demo/disp./existing pit-50'push $0.1870 $1,683.00 100% $1,683.00 <br />Footings 2 3 75 LF Demo/disp./exc. pit, 2'X3 - 50' ft. $23.8300 $1,787.25 100% $1,787.25 <br />Deer Creek Vent Shaft collar (TR-109) 8 3 88 78 CY Concr. pave., demo., 7-24" th., taint. $92.0000 $7,176.00 100% $7,176.00 <br />Deer Creek Emergency Shaft Building (TR-109) <br />Superstructure 30 20 30 18,000 CF Demo/disp./exc. pit- 10K' haul $0.2180 $3,924.00 100% $3,924.00 <br />Floor 30 20 8 600 SF Demo.disp exc. pit, 8" tK - 200 ft. $2.6800 $1,608.00 100% $1,608.00 <br />Footings 2 3 24 LF Demo/disp./exc. pit, 2'X3 - 200 ft. $24.0800 $577.92 1001/ $577.92 <br />Deer Creek Emergency Shaft Generator Building (TR-109) <br />Superstructure 30 10 10 3,000 CF Demo/disp.lexc. pit - 10K' haul $0.2180 $654.00 100% $654.00 <br />Floor 30 10 8 300 SF Demo.disp exc. pit, 10" th. - 200 ft. $3.3500 $1,005.00 100% $1,005.00 <br />Deer Creek Enter. Shaft propane tank (TR-109) 1 EA Fxctload non-leaking-31(- 6Kgal. $426.00 $426.00 100% $426.00 <br /> 1 EA Haul to cert. Dump- 3K-5K gal. $660.00 $660.00 100% $660.00 <br />Deer Creek Emergency Shaft collar (TR-109) 4 3 25 11 CY Concr. pave., demo., 7-24" th., reinf. $92.00 $1,012.00 100% $1,012.00 <br />Minnesota Reservoir robotic monitoring station <br />Skid-mounted steel building 10 10 11 1,100 CF Demoldisp./exc. pit- 1W haul so.2190 $239.80 1001/6 $239.80 <br />Gale at USFS Rd. 711.213 30 4 30 30 LF Fencing, chain link - to a ft. high $1.0200 $57.60 100% $57.60 <br />Total for this page before location adjustment $22,154.57 $22,154.57 <br />Location adjustment: 92.32% Total for this page after location adjustment $20,453.10 $20,453.10 <br />Grand total for this task after location adjustment $20,453.10