My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-08-31_PERMIT FILE - C1981041 (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981041
>
2009-08-31_PERMIT FILE - C1981041 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:08 PM
Creation date
9/30/2009 9:53:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Permit File
Doc Date
8/31/2009
Doc Name
Alternative Land Use Halliburton Documents & Approvals Unit Train Loadout PR4
Section_Exhibit Name
Tab 15 Appendix 15-2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 5 Colorado Department of Public Health and Environment <br />• Air Pollution Control Division <br />Halliburton Energy Services, Inc. <br />Permit No. 06ME0729 <br />INITIAL APPROVAL <br />c. Records of startups, shutdowns, and malfunctions shall be maintained, as required under <br />§ 60.7. <br />7. Prior to final approval, the owner or operator of this unit shall submit fuel specifications provided by <br />the supplier to demonstrate compliance with permit condition no. 10 above on a continuous basis <br />(Reference: Regulation No. 3, Part B, III.E.). <br />8. A revised Air Pollutant Emission Notice (APEN) shall be filed: (Reference: Reg.3, Part A,II.C) <br />a. Annually whenever a significant increase in emissions occurs as follows: <br />For any criteria pollutant: <br />For sources emitting less than 100 tons per year, a change in actual emissions of five tons <br />per year or more, above the level reported on the last APEN; or <br />b. Whenever there is a change in the owner or operator of any facility, process, or activity; or <br />c. Whenever new control equipment is installed, or whenever a different type of control <br />equipment replaces an existing type of control equipment; or <br />• d. Whenever a permit limitation must be modified; or <br />e. No later than 30 days before the existing APEN expires. <br /> <br />9. This permit shall expire if the owner or operator of the source for which this permit was issued: (i) <br />does not commence construction/modification or operation of this source within 18 months after either <br />the date of issuance of this initial approval permit or the date on which such construction or activity <br />was scheduled to commence as set forth in the permit application associated with this permit; (ii) <br />discontinues construction for a period of eighteen months or more; or (iii) does not complete <br />construction within a reasonable time of the estimated completion date (See General Condition No. <br />6., Item 1.). Upon a showing of good cause by the permittee, the Division may grant extensions of the <br />permit. (Reference: Regulation No. 3, Part B, Section III.F.4.) <br />10. Within one hundred and eighty days (180) after commencement of operation, compliance with the <br />conditions contained on this permit shall be demonstrated to the Division. It is the permittee's <br />responsibility to self certify compliance with the conditions. Failure to demonstrate compliance within <br />180 days may result in revocation of the permit. (Information on how to certify compliance was mailed <br />with the permit.) <br />By: By: . <br />Sun a Fadeyi, P.E. K Hancock III, P.E. <br />Permit Engineer Unit Leader <br />077/0416/002 A15-2-15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.