My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMIT FILE - 9/30/2009, 7:04:47 AM-JWD
DRMS
>
Public
>
PERMIT FILE - 9/30/2009, 7:04:47 AM-JWD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:28:43 PM
Creation date
9/30/2009 7:39:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2009005
IBM Index Class Name
PERMIT FILE
Doc Date
9/29/2009
Doc Name
Second Review of NOI
From
DRMS
To
Cats-International
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Letter to Stephen Hilgers 2 September 29, 2009 <br />Second Review of Santia)zo Mine NOI File No. P-2009-005 <br />5. Thank you for the information and demolition cost estimates for the mill provided in the August 31, 2009 <br />submittal. In order for the DRMS to compete confirmatory cost estimating, please provide the following <br />additional information: <br />a. The height of the two building segments that make up the mill structure. <br />b. The dimensions of the wooden water tank adjacent to the mill. <br />c. The length and maximum height of the wooden trestle accessing the mill building. <br />6. In the August 31, 2009 submittal, you maintain the flexibility to temporarily remove and/or modify the <br />existing secure gated access closures that have been installed on the Santiago Mine 5th Level portal by the <br />DRMS Inactive Mine Program. It is the direct experience of the DRMS at multiple sites similar to the <br />Santiago Mine, that removal or alteration of an existing closure results in the need to ultimately replace the <br />closure starting from scratch. Therefore, DRMS will require sufficient bond for full portal closure <br />replacement. Please provide dimensions for the portal so that replacement costs can be estimated to establish <br />the amount of required bond. <br />7. In its initial review letter, dated July 7, 2009, DRMS stated that any newly generated waste rock from <br />proposed prospecting operations must be isolated from the existing dump and must be encapsulated by low <br />permeability liners and covers prior to revegetation, and required an encapsulation design and location <br />information for DRMS review. The initial review letter stated that encapsulation designs must be prepared <br />by a geotechnical engineer or other qualified person(s). The information provided with the August 31, 2009 <br />submittal does not remotely approach the detail needed for an encapsulation design as required. The DRMS <br />is willing to meet by telephone or otherwise with your geotechnical engineer or other qualified person(s) to <br />discuss the basic minimum requirements for the design. <br />Once you have adequately responded to the items listed above, DRMS will estimate the costs to reclaim your <br />proposed prospecting disturbances. You may not commence prospecting operations until the bond has been <br />submitted and you have been notified in writing that the bond has been accepted by the DRMS. <br />If you have any questions, please contact me at 303-866-3567 extension 8143. <br />Sincerel , <br />Allen C. Sorenson <br />Reclamation Specialist <br />enclosure(s) <br />cc: Patti Turecek, Forest Service <br />cAacs files\My Documents 4-19-06 thru\santiago second review letter.doc
The URL can be used to link to this page
Your browser does not support the video tag.