Laserfiche WebLink
reapplication volumes, and the general location of any planned enhancement procedures <br />(i.e. contour furrows, soil berms, etc.) This plan will appear on the Annual Report Map <br />currently labeled as Exhibit 5A in the Annual Reclamation Report. The overall goal of <br />both the Division and Colowyo is to replace the entire resource in a manner that promotes <br />the likelihood reclaimed areas will meet the success criteria for Phase III Bond Release <br />after the required liability periods and thereby create reclaimed lands that reflect the <br />desired post-mine land use (grazingland and sagebrush steppe)." <br />Colowyo believes that the Stipulation is satisfied by the above-mentioned concessions. <br />Colowyo has described in great detail the process, criteria, limitations, and goals that will <br />be applied to all reclamation areas moving forward. The proposed path moving forward <br />is a logical process that is verifiable and ensures the topsoil resource is managed <br />appropriately. <br />Please contact me should you have any questions or concerns at 970-824-1531. <br />Sincerely, <br />Kurtis R. Blunt <br />Environmental Engineer <br />cc: File