My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-28_REVISION - C1994082
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2009-09-28_REVISION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:51 PM
Creation date
9/29/2009 3:24:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
REVISION
Doc Date
9/28/2009
Doc Name
Response to Adequacy Comments
From
Seneca Coal Company
To
DRMS
Type & Sequence
TR43
Email Name
DTM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOMU ccoNal conwany Seneca Coal Com an <br />? p Y <br />September 23, 2009 <br />Mr. Dan Mathews <br />Division of Reclamation, Mining and Safety <br />101 South 3,d, Suite 301 <br />Grand Junction, CO 81501 <br />(970) 243-1571 <br />RE: Yoast Mine Permit No. C-94-082 <br />Technical Revision No. (TR-43), Runoff Control Structures <br />Response to Adequacy Comments <br />Mr. Mathews, <br /> <br />SEP 2 8 2009 <br />Division u, ?leclarnation. <br />Mining and Safety <br />Seneca Coal Company (SCC) has reviewed your preliminary adequacy review letter dated September 18, 2009 <br />and has developed the following responses. <br />• 1. Because these structures will control runoff fmm disturbed areas, all of these proposed structures must be located along <br />drainages hydraulically up gradient from an approved sedimentation pond that has a CDPS permit. Please add a <br />statement to the revised text on page 11, Tab 20, to clarify that any such runoffcontnol <br />structures will be located will be located up-gradient from existing sediment ponds with <br />approved CPDS permits. <br />Response: A statement has been added to page 11. <br />2. We have received comments re <br />garding the proposed runoff control structures firm the Division of Water Resource Since <br />the structure is subject to administration it must not store water out-of-priority. All storage must be drained fmm the <br />runoff control structures within twenty four hours or as directed by the division engineer and/or water commissioner The <br />D IVR's memorandum from Craig M. L", P.E., Water Resourre Engineer, is attached <br />Please provide a response and appropriate design changes to comply with the DWR directive. <br />Response: We assume that the "out-of-priority" water is any impounded water in excess of the 2 acre feet. <br />As the DRMS/DWR will note from the designs, these structures are not designed to impound water only to <br />slow the runoff velocity to reduce potential downstream erosion. Therefore these are not impoundments as <br />defined by DWR regulations and guidelines. <br />3. The design, construction, and maintenance of the runoff control structures must ensure that water flows through the <br />control structure following a storm event. Certain design and construction modifications are warranted in order to ensure <br />• that the structures will not impound water, and will comply with the DWR request referenced in Item 2 above. <br />Seneca Coal Company . P.O. Box 670 • Hayden, Colorado 81639 <br />Telephone (970) 276-5219 . FAX (970) 276-5222
The URL can be used to link to this page
Your browser does not support the video tag.