My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-28_PERMIT FILE - X200522700 (3)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
X200522700
>
2009-09-28_PERMIT FILE - X200522700 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:50 PM
Creation date
9/29/2009 3:22:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200522700
IBM Index Class Name
PERMIT FILE
Doc Date
9/28/2009
Doc Name
180 Day Report
From
Twentymile Coal Company
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.' COLORADO DIVISION OF RECLAMATION, DINING AND SAFETY <br />5- 131 3 Shliel"17 an qtr ir, t. ll•:?4?117 "15. ?, 11S c'1. C-I? 1.lE?C? ;til ?I f? (_i?13;1 8647-35f)7 <br />SEP 2 0 2009 <br />COAL EXPLORATION 180-DAY REPORT D'VMinin ga' aeon, <br />9 and d Saf Safety <br />Prospector: Juniper Coal Company Site Contact Address: <br />Notice of Intent Nos.: X-2005-227-00 Scott Cowman <br />Address: 701 Market Street, Suite 832 29515 Routt County Road 27 <br />St. Louis, MO 63101 Oak Creek, CO 80467 <br />Project Name: 2005 Big Elk Exploration Date: September 24, 2009 <br />Proj ect <br />County: Routt <br />This report is filed in accordance with Rule 2.02.6(3)(a) of the Regulations of the Colorado Mined Land <br />Reclamation Board for Coal Mining, adopted in accordance with the Colorado Surface Coal Mining Act, <br />C.R.S. 34-33-101 et seq. The purpose of this report is to update the Division on exploration and reclamation <br />activities that have occurred in the past 180 days of active prospecting. The report also indicates any changes <br />in operations from what was stated in the original Notice of Intent sent to the Division. The Operator may <br />use this form, modify this form, or use a different format altogether. <br />Attach a map that shows: <br />a) Which proposed holes have been drilled at the date, <br />b) Any actual or proposed relocation(s) of holes, <br />c) The extent of all significant road construction completed to date (exclude <br />minor blade work), and <br />d) Current location of all drill-rigs and test equipment. <br />2. Describe what and where reclamation activities have occurred in the past 180 days. Mention sealing and <br />plugging, regrading, retopsoiling and reseeding activities. (Attach additional pages, if needed.) <br />All exploration holes (3 pads at less than %4 acre each) have been reclaimed and the three holes that were drilled were sealed and <br />plugged. <br />3. List any additional changes to the original prospecting and reclamation plan or any unexpected problems <br />(such as unexpected water or artesian conditions encountered). (Attach additional pages, if needed.) <br />None <br />4. When do you expect to complete all exploration and reclamation activities for this project? <br />The exploration and reclamation activities have been completed.
The URL can be used to link to this page
Your browser does not support the video tag.