Hole Easting Northing Elevation Hole Hole Type of Cement/Sealant
<br />No. Depth Diameter
<br /> (ft) (in.)
<br />ccu012 1514.5 6.25 Fly Ash Slurry w/ Superplasticiz er
<br /> 2,535,519.00 1,402,261.00 6,645 and 1.5% Cale Chloride
<br />ccu013 2,548,724.54 1,388,248.20 7,294 925 6.25 Monitoring Well
<br />ccu014 2,544,094.69 1,388,326.57 6,987 1112.8 6.25 Monitoring Well
<br />ccu015 1111 6.25 Fly Ash Slurry w/ Superplasticiz er
<br /> 2,543,272.51 1,391,417.19 6,998 and 1.5% Cale Chloride
<br />ccu017 520 6.25 Fly Ash Slurry w/ Superplasticiz er
<br /> 2,544,850.63 1,406,238.94 6,696 and 1.5% Calc Chloride
<br />ccu018 520 6.25 Fly Ash Slurry w/ Superplasticiz er
<br /> 2,546,472.55 1,396,230.17 6,905 d 1.5% Cale Chloride
<br />ccu020 830 6.25 Fly Ash Slurry w/ Superplasticiz er
<br /> 2,551,073.81 1,391,814.05 7,522 and 1.5%Cale Chloride
<br />ccu021 1100 6.25 Fly Ash Slurry w/ Superplasticiz er
<br /> 2,543,035.94 1,399,350.82 6,847 and 1.5% Cale Chloride
<br />ccu022 575 6.25 Fly Ash Slurry w/ Superplasticiz er
<br /> 2,547,634.43 1,393,688.71 7,117 and 1.5% Cale Chloride
<br />ccu023 1220.6 6.25 Monitoring Well
<br />mwl 2,541,052.70 1,396,606.50 6,738
<br />ccu023 1220.6 6.25 Monitoring Well
<br />mw2 2,541,052.70 1,396,606.50 6,738
<br />ccu023 1220.6 6.25 Monitoring Well
<br />mw2 2,541,052.70 1,396,606.50 6,738
<br />ccu027 1560 6.25 Fly Ash Slurry w/ Superplasticiz er
<br /> 2,537,928.90 1,393,862.90 6,913 and 1.5% Cale Chloride
<br />ccu028 1621 6.25 Fly Ash Slurry w/ Superplasticiz er
<br /> 2,535,510.50 1,397,070.30 6,824 and 1.5% Cale Chloride
<br />ccu029 620 6.25 Fly Ash Slurry w/ Superplasticiz er
<br /> 2,545,782.80 1,402,631.90 6,935 and 1.5% Cale Chloride
<br />ccu030 2,532,574.92 1,402,159.95 6,652 320 6.25 Water Well
<br />ccu032 1050 6.25 Fly Ash Slurry w/ Superplasticiz er
<br /> 2,544,378.14 1,395,868.81 7,073 and 1.5%Cale Chloride
<br />ccu033 1520 6.25 Fly Ash Slurry w/ Superplasticiz er
<br /> 2,540,198.40 1,392,331.00 6,929 and 1.5%Cale Chloride
|