C?
<br />U
<br />Tailings Impoundment Capacity
<br /> To tals Operating Duration @ Total
<br />Bench Zone Cu. Yds. Tonna e* Cu. Yds. Tonna a 80 ton/day (months) Months
<br />Dam To of Dam 6,078 9,117 6,078 9,117 3.8 3.8
<br />Bench 1 Ste 1 10,081 15,122 6
<br />3
<br /> Ste 2 12,893 19,339 .
<br />8
<br />1
<br /> Ste 3 18,713 28,069 .
<br />11
<br />7
<br /> Ste 4 17,444 26,167 59,131 88,697 .
<br />10.9 37.0
<br />Bench 2 Ste 5 16,674 25,011 10
<br />4
<br /> Ste 6 18,967 28,450 .
<br />11
<br />9
<br /> Ste 7 20,965 31,447 .
<br />13
<br />1
<br /> Ste 8 23,074 34,611 79,680 119,519 .
<br />14.4 49.8
<br />Bench 3 Ste 9 21,861 32,792 13
<br />7
<br /> Ste 10 23,370 35,056 .
<br />14
<br />6
<br /> Ste 11 25,263 37,894 .
<br />15
<br />8
<br /> Ste 12 27,296 40,944 97,791 146,686 .
<br />17.1 61.1
<br />Bench 4 Ste 13 26,167 39,250 16
<br />4
<br /> Ste 14 28,824 43,236 .
<br />18
<br />0
<br /> Ste 15 30,726 46,089 .
<br />19
<br />2
<br /> Ste 16 33,185 49,778 118, 902 178,353 .
<br />20.7 74.3
<br />Bench 5 Ste 17 31,156 46,733 19
<br />5
<br /> Ste 18 32,830 49,244 .
<br />20
<br />5
<br /> Ste 19 33,133 49,700 97,119 145,678 .
<br />20.7 60.7
<br />Totals 458,700 688,050 286,7
<br />(months)
<br />* Tonnage figured at 1.5 ton/cu. yd. 23.9
<br />ears
<br />0
|