To summarize this Schedule, the amount of the Financial Warranty Cash Bond for the previously defined Maximum <br />Disturbance - Bench #2 shall be: <br />Total Reclamation Cost for Maximum Disturbance - Bench #2 as <br />defined in Exhibit D, 6.3.4(2): Tailings & Mobile Mill Site <br />.. __ ,?,_.._.?.«....? RAwim„m nict,rhance - Bench #2 $34,496.0 <br />Mill Site Maximum Disturbance <br />.00 <br />5% DRMS Office Admin., per 6 <br />• <br />An adjustment of the standing bond shall be made to reflect continuing operations forward of Bench #2 to total <br />build-out, more specifically the completion through Bench 45 (scheduled to occur at 90 months/7.5 years): <br />Additional Bond Requirement to Proceed from Bench #2 thru <br />Total Build-out of Bench #5 <br />Winnc imnnundment Maximum Disturbance - Bench #5 $52,093.2 <br />#5 - <br />7.597 <br />Maximum Disturbance - Bench <br />5% DRMS Office Adm <br />for <br />Refer to the Reclamation Cost Schedule in the following appendix for more detailed information. <br />0 <br />• <br />Appendix to Exhibit D 1& 42289 <br />• Clear Creek County Mining District Zoning Regulations O'cE'~••a••.••`'; <br />• Phelps Dodge Climax Mine Reclamation Project ss?ONAL EF <br />• Arkansas Valley Seed Co. "Mountain Mix" seed specification <br />• Reclamation Cost Schedule <br />• Tailings Impoundment Capacity <br />• Letter from Doyle Construction, Inc. regarding third party contractor reclamation <br /> <br />7