Laserfiche WebLink
CAPPING ALTERNATIVE <br />SURFACE CONTROL MEASURES WILL ELIMINATE CONTAMINATION OF SURFACE WATER DUE TO RUNOFF FROM THE <br />MINE TAILINGS AND WASTE ROCK SITES AND PREVENT HUMAN EXPOSURE THROUGH INHALATION AND INGESTION. <br />10CH MEASURES COULD INCLUDE REGRADING THE SITE TO STABILIZE EXISTING SLOPES AND CONTROL SURFACE <br />TER RUNOFF, PROVIDING A CONTAINING CAP OVER THE TAILINGS AND WASTE ROCK MATERIAL, OR <br />REVEGETATION OF THE SITE. <br />SIX TYPES OF CAPS WERE EVALUATED FOR EACH SITE INCLUDING SYNTHETIC LINERS, BITUMINOUS PAVEMENT, <br />SOIL CEMENT LAYERS, SOIL COVER, CLAY BARRIER/SOIL COVER, AND A MODIFIED RESOURCE CONSERVATION <br />AND RECOVERY ACT (RCRA) CAP - A FROST-RESISTANT CLAY BARRIER/SOIL COVER). <br />THE CAPPING ANALYSIS INDICATED THAT CONTAINMENT IS EFFECTIVE, TECHNICALLY FEASIBLE AND CAN BE <br />IMPLEMENTED. THEREFORE, THESE ALTERNATIVES WERE CONSIDERED FURTHER IN THE DETAILED SCREENING OF <br />REMEDIAL ACTION ALTERNATIVES. THE INITIAL SCREENING RESULTED IN THE FOLLOWING CAPPING <br />ALTERNATIVES FOR FURTHER EVALUATION: <br />NATIONAL TUNNEL <br />- SYNTHETIC LINER <br />- SOIL CEMENT COVER. <br />ARGO TUNNEL <br />- SYNTHETIC LINER <br />- SOIL CEMENT COVER. <br />GREGORY INCLINE <br />- REPLACEMENT OF EXISTING GABION WALL <br />• - SYNTHETIC LINER OR SOIL CEMENT COVER. <br />QUARTZ HILL TUNNEL <br />- PAVEMENT OF PARKING LOTS <br />- SYNTHETIC LINER OR SOIL CEMENT COVER. <br />BIG FIVE TUNNEL <br />- SOUTH SIDE OF CLEAR CREEK - REMOVE TO NORTH SIDE OF CREEK OR OFF-SITE DISPOSAL. <br />- NORTH SIDE OF CLEAR CREEK - SYNTHETIC LINER OR SOIL CEMENT COVER. <br />VARIOUS CAPS WERE ELIMINATED DURING THE INITIAL SCREENING. THOSE CAPS SCREENED OUT INCLUDED <br />SOIL COVER, CLAY BARRIER/SOIL COVER, BITUMINOUS COVER AND MODIFIED RCRA CAP. MOST OF THESE <br />COVERS COULD NOT BE IMPLEMENTED ON THE STEEP SLOPES. MORE DETAILS CONCERNING THE SCREENING <br />EVALUATION CAN BE FOUND IN SECTION 2 OF THE FEASIBILITY STUDY REPORT. <br />OFF-SITE DISPOSAL ALTERNATIVE <br />THE OFF-SITE DISPOSAL ALTERNATIVE CONSIDERS THE OPTION OF TRANSPORTING THE MINE TAILINGS AND <br />WASTE ROCK MATERIAL TO EITHER A LOCAL MUNICIPAL LANDFILL OR TO A RCRA PERMITTED LANDFILL. <br />THE MOST LIKELY MUNICIPAL LANDFILL WOULD BE A FACILITY OPERATED BY BROWNING FERRIS INCORPORATED <br />(BFI) NEAR 88TH AND TOWER ROAD NORTHEAST OF DENVER. THIS IS A RELATIVELY NEW FACILITY WHICH <br />REPLACES A BFI FACILITY ALONG COLORADO STATE HIGHWAY 93 BETWEEN GOLDEN AND BOULDER, WHICH HAS <br />NOW BEEN CLOSED. THE PRIMARY CONCERN WITH THIS ALTERNATIVE, HOWEVER, WOULD BE WHETHER OR NOT <br />THE APPROPRIATE REGULATORY AGENCIES OR THE OPERATOR WOULD ALLOW DISPOSAL OF MATERIALS FROM A <br />W CIA SITE AT A MUNICIPAL LANDFILL EVEN IF IT WAS NOT A RCRA CHARACTERISTIC WASTE. A SECOND <br />KERN WOULD BE THE IMPACT OF SUCH A LARGE VOLUME OF MATERIAL ON A LANDFILL DESIGNED PRIMARILY <br />FOR MUNICIPAL USE. <br />THE SECOND ALTERNATIVE FOR DISPOSAL OF THE MATERIAL IS LANDFILL AT A PERMITTED RCRA LANDFILL. <br />THREE SITES WERE INVESTIGATED, INCLUDING THE NEW LAST CHANCE SITE, OPERATED BY BFI NEAR LIMON,