Laserfiche WebLink
THE REQUEST OF SEVERAL WHO ATTENDED THE PUBLIC MEETING, EPA EXTENDED THE PUBLIC COMMENT PERIOD <br />ON THE OPERABLE UNIT NO. TWO FS TO DECEMBER 18, 1987 AND ASSURED CONCERNED INDIVIDUALS THAT LATE <br />COMMENTS WOULD BE ACCEPTED UP UNTIL THE DECISION WAS MADE (LATE MARCH). <br />WE OPERABLE UNIT NO. TWO RESPONSIVENESS SUMMARY CONTAINS THE OFFICIAL TRANSCRIPT OF THE PUBLIC <br />TING, DESCRIBES IN MORE DETAIL THE NATURE AND LEVEL OF THE COMMUNITY'S CONCERN, AND INCLUDES <br />EPA'S RESPONSES TO ALL COMMENTS RECEIVED DURING THE PUBLIC REVIEW OF THE OPERABLE UNIT NO. TWO <br />FS. <br />#ENF <br />ENFORCEMENT <br />A RESPONSIBLE PARTY SEARCH FOR THE CLEAR CREEK/CENTRAL CITY SUPERFUND SITE HAS BEEN INITIATED. <br />THE SEARCH HAS REVEALED INFORMATION ON OWNERSHIP OF THE MINE TAILINGS AND WASTE ROCK PILES. AT <br />THIS TIME, HOWEVER, THIS SEARCH HAS NOT BEEN COMPLETED. EPA DOES NOT FEEL THAT RESPONSE ACTIONS <br />SHOULD BE DELAYED PENDING FINALIZATION OF THE RESPONSIBLE PARTY SEARCH. UPON FINALIZATION OF <br />THE SEARCH, THE STATUS OF RESPONSIBLE PARTIES WILL BE DETERMINED AND EVALUATED AND, IF <br />APPROPRIATE, EPA WILL FORMALLY NOTIFY THEM OF THE SELECTED REMEDY FOR OPERABLE UNIT NO. TWO AND <br />WILL INITIATE NEGOTIATIONS FOR THE IMPLEMENTATION OF THE REMEDY. IF THE POTENTIALLY RESPONSIBLE <br />PARTIES DO NOT FORMALLY COMMIT TO PERFORMING THE REMEDY IN A TIMELY MANNER, OR IF NO POTENTIALLY <br />RESPONSIBLE PARTIES ARE FOUND, EPA WILL PROCEED WITH A FUND-FINANCED REMEDIAL DESIGN AND <br />REMEDIAL ACTION AND WILL ATTEMPT TO RECOVER EPA'S RESPONSE COSTS FROM THE RESPONSIBLE PARTIES. <br />IDENTIFICATION AND SCREENING OF ALTERNATIVES <br />THE EPA EVALUATED POTENTIAL REMEDIAL ACTION ALTERNATIVES TO ABATE THE THREAT POSED BY <br />CONTAMINATION FROM THE FIVE MINE TAILING AND WASTE ROCK PILES BY PROGRESSING THROUGH THE SERIES <br />OF ANALYSES WHICH ARE OUTLINED IN THE NATIONAL CONTINGENCY PLAN (NCP), IN PARTICULAR, 40 CFR <br />SECTION 300.68, THE INTERIM GUIDANCE ON SUPERFUND SELECTION OF REMEDY, DECEMBER 24, 1986, (OSWER <br />DIRECTIVE NO. 9355.0-19) AND THE ADDITIONAL INTERIM GUIDANCE FOR FY '87 RECORDS OF DECISION, <br />LY 24, 1987, (OSWER DIRECTIVE NO. 9355.0-21). THIS PROCESS, IN PART, ENABLES THE EPA TO <br />RESS THE SARA SECTION 121 REQUIREMENTS OF SELECTING A REMEDIAL ACTION THAT IS PROTECTIVE OF <br />HUMAN HEALTH AND THE ENVIRONMENT, THAT IS COST-EFFECTIVE, THAT ATTAINS FEDERAL AND STATE <br />REQUIREMENTS THAT ARE APPLICABLE OR RELEVANT AND APPROPRIATE, AND THAT UTILIZES PERMANENT <br />SOLUTIONS AND ALTERNATIVE TREATMENT TECHNOLOGIES OR RESOURCE RECOVERY TECHNOLOGIES TO THE <br />MAXIMUM EXTENT PRACTICABLE. ADDITIONALLY, SARA SECTION 121 AND THE GUIDANCE DOCUMENTS <br />REFERENCED ABOVE REQUIRE THAT EPA GIVE PREFERENCE TO REMEDIES WHICH EMPLOY TREATMENT WHICH <br />PERMANENTLY AND SIGNIFICANTLY REDUCES THE MOBILITY, TOXICITY, OR VOLUME OF HAZARDOUS SUBSTANCES <br />AS THEIR PRINCIPAL ELEMENT. <br />THE SELECTION OF REMEDY PROCESS BEGINS BY IDENTIFYING CERTAIN SITE-SPECIFIC INFORMATION TO BE <br />ASSESSED IN DETERMINING THE TYPES OF RESPONSE ACTIONS THAT WILL BE CONSIDERED FOR THE SITE. A <br />GENERAL LIST OF SITE-SPECIFIC INFORMATION IS CONTAINED IN SECTION 300.68(E)(2) OF THE NCP. THIS <br />LIST WAS USED TO IDENTIFY SPECIFIC SITE AND WASTE CHARACTERISTICS FOR OPERABLE UNIT NO. TWO OF <br />THE CLEAR CREEK/CENTRAL CITY SITE. BASED UPON THESE SITE AND WASTE CHARACTERISTICS, THE EPA WAS <br />ABLE TO REDUCE, FROM THE UNIVERSE OF MANY POSSIBLE RESPONSE ACTIONS, A SET OF RESPONSE ACTIONS <br />AND ASSOCIATED TECHNOLOGIES TO BE CONSIDERED FOR OPERABLE UNIT NO. TWO. <br />SECTION 121(B)(1) OF SARA REQUIRES THAT AN ASSESSMENT OF PERMANENT SOLUTIONS AND ALTERNATIVE <br />TREATMENT TECHNOLOGIES OR RESOURCE RECOVERY TECHNOLOGIES THAT, IN WHOLE OR IN PART, WILL RESULT <br />IN A PERMANENT AND SIGNIFICANT DECREASE IN THE TOXICITY, MOBILITY, OR VOLUME OF THE HAZARDOUS <br />SUBSTANCE, POLLUTANT, OR CONTAMINANT BE CONDUCTED. THE ALTERNATIVE TREATMENT AND RESOURCE <br />RECOVERY TECHNOLOGIES CONSIDERED INCLUDED CHEMICAL FIXATION AND REPROCESSING. <br />THE NEXT STEP OF THE SELECTION OF REMEDY PROCESS IS ASSEMBLING THE TECHNOLOGIES AND/OR DISPOSAL <br />OPTIONS INTO REMEDIAL ACTION ALTERNATIVES. PURSUANT TO OSWER DIRECTIVE NO. 9355.0-19, "INTERIM <br />GUIDANCE ON SUPERFUND SELECTION OF REMEDY", REMEDIAL ACTION ALTERNATIVES WERE CONSIDERED RANGING <br />a(OM THOSE THAT WOULD ELIMINATE THE NEED FOR LONG-TERM MANAGEMENT (INCLUDING MONITORING) AT THE <br />E TO ALTERNATIVES INVOLVING TREATMENT THAT WOULD REDUCE MOBILITY, TOXICITY, OR VOLUME AS <br />THEIR PRINCIPAL ELEMENT. REMEDIAL ACTION ALTERNATIVES DEVELOPED IN THIS WAY WILL VARY MAINLY IN <br />THE DEGREE TO WHICH THEY RELY ON LONG-TERM SITE MANAGEMENT. FURTHER, A NO ACTION ALTERNATIVE <br />WAS DEVELOPED AS REQUIRED BY SECTION 300.68(F)(1)(V) OF THE NCP.