Laserfiche WebLink
TABLE 3 <br />SMd4ARY OF COST FOR PREFERRED OPTION <br />• SLOPE RUNON <br />COST STABILIZATION CONTROL <br />CAPITAL <br />GREGORY INCLINE $ 0 $ 25,300 <br />NATIONAL TUNNEL - 19,700 <br />QUARTZ HILL - 154,300 <br />ARGO TUNNEL - 31,900 <br />BIG FIVE 207,800 231,400 <br />SUBTOTAL $207,800 $462,600 <br />ENGINEERING, MANAGEMENT <br />AND CONTINGENCY $ 58,200 129,500 <br />TOTAL CAPITAL $266,000 $592,100 <br />OPERATIONS AND MAINTENANCE <br />FIVE YEAR EVALUATION $ 10,000 $ 10,000 <br />ANNUAL REPAIR 9,000 25,000 (A) <br />ANNUAL TOTAL <br />(INCLUDING 20% CONTINGENCY) 10,800 30,000 <br />FIVE YEAR RECURRING TOTAL <br />(INCLUDING 20% CONTINGENCY) 12,000 12,000 <br />PRESENT WORTH COST <br />(INFLATION = 4% AND <br />INTEREST = 10%) 330,900 718,700 <br />TOTAL BOTH OPTIONS $1,049,600 <br />(A) INCLUDES REPAIR OF FIVE PERCENT OF THE TOTAL LENGTH EACH YEAR. <br />0