My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-25_PERMIT FILE - M2009076 (38)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009076
>
2009-09-25_PERMIT FILE - M2009076 (38)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:47 PM
Creation date
9/28/2009 3:07:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009076
IBM Index Class Name
PERMIT FILE
Doc Date
9/25/2009
Doc Name
Ex. C- Mining Plan
From
Venture Resources
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The EPA currently is doing extensive monitoring of ground water sources (as stated earlier, The Big Five Tunnel <br />drainage is monitored, collected, and pumped to the Argo Tunnel Treatment Facility located in Idaho Springs). <br />Proposed Point of Compliance: <br />For pre-existing, baseline quality of ground water beneath the proposed facility please refer to "Explanation of <br />Significant Differences Big Five Tunnel Discharge", attached at the end of this Exhibit C. The Big Five Tunnel is <br />within the vicinity beneath the proposed disposal area at a depth of approximately 1,100 feet. The condition of the <br />existing ground water (Table 1.0 in this publication) is significantly worse than the mill process water (see lab <br />analysis of proposed waste stream attached). <br />TABLE 1.0 ANALYTICAL SUMIARY TABLE BIG FIVE DISCHARGE SAMPLES <br />Metals concentrations cxpnemed in micrograms/Liter <br />Sampling Event As Cd Cu Hg Mn Pb Zu <br />1985 Pbase I RI 10 48 1710 NAF 19,700 91 9770 <br />1989 Phase 11 RI 10 27 690 NAF 18,800 5 9100 <br />2001 CDPHE NAF 24 1500 NAF 32,200 NAF 9160 <br />2005UOSni 2 20 2960 0.1 191SO0 16 7610 <br />State Drinking Water MCL <br /> <br />State Drinkia Water MCLG <br />State Steondary bd <br />A vatic Life NE4C/W 10 <br /> <br /> <br />- <br />5 5 <br />1 <br /> <br />- <br />0.413 - <br /> <br />1300 <br />100 <br />517 2 <br /> <br /> <br />- <br />0.01 <br /> <br />- <br />50 <br />1000/1493 <br /> <br />15 <br />- <br />412 - <br /> <br />- <br />S00 <br />47/200 <br />NAF - Not Analyzed For <br />MCL - Maximum Contaminant Level <br />MCLG - Maximum Contaminant Level Goal <br />NEC - No Effect Concentrations are metal concentrations at which aquatic life does not suffer any to=te effects <br />(1) UOS - START contractor for EPA's,BmeMeney Response Team <br />(2) WQCD - aquatic standards for Clear Creek Segment 2 <br />In the event there is infiltration into the ¢roundwater table the net equality could only significantly improve. <br />A current sampling of the Big 5 Tunnel discharge also follows in this Exhibit C. <br />This sampling was done over a period of time from 1985 - 2009. It becomes apparent that the reported metals <br />concentration varies widely. Rationale for this can be explained by variation in rainfall amounts preceding the <br />sampling and the concentration of that rainfall in different areas of differing mineralization. This wide variability <br />can not be attributed to active mining operations because we are not aware of any within this drainage area over this <br />period of time. <br />13
The URL can be used to link to this page
Your browser does not support the video tag.