Laserfiche WebLink
• <br />• <br />• <br />Permit rmm?linnne i .imitc Raced nn Hictnrie k.. Current RiQ 5 Tunnel Discharge* <br />Metal Limit <br />micro s/liter Limit nigil <br />milli s/liter Justification <br />Arsenic, As 10 0.01 Historic Big 5 <br />Barium, Ba 2000 ??? 2 Domestic Water Std. <br />Cadmium, Cd 48 0.048 Historic Big 5 <br />Chromium, Cr 100 0.1 Domestic Water Std. <br />Copper, Cu 2960 2.96 Historic Big 5 <br />Lead, Pb 91 0.091 Historic Big 5 <br />Manganese, Mn 32,200 32.2 Historic Big 5 <br />Merc , H 2 0.002 Domestic Water Std. <br />Selenium, Se 50 0.05 Domestic Water Std. <br />Silver, A 50 0.05 Domestic Water Std. <br />Zinc, Zn 9770 9.77 Historic Big 5 <br />*Note: It is necessary to apply a dilution factor of 1:3 to lab analysis of pilot plant samples in oraer to correlate me <br />data to proposed Mobile Mill operations. Refer to the explanation in the attached Waste Stream Characterization. <br />See 6.3.3(2)(b) for a detailed explanation of Points of Compliance. <br />designated chemicals to be used. There is also a complete collection of MSDS for these chemicals at the end of <br />Exhibit C. <br />6.4.20(10)(a)(i) <br />There are no Designated Chemicals to be used in this operation. Refer to Exhibit C, 63.3(2)(a) for a list of non- <br />There are no extractive metallurgical processes proposed as part of this operation, only gravity and flotation <br />concentration methods. <br />6.4.20(10)(a)(ii) <br />The stormwater management design has been performed by a CO licensed professional engineer. See this design in <br />Exhibit C and Exhibit E. <br />6.4.20(10)(a)(iii) <br />The stormwater management design has been performed by a CO licensed professional engineer. See this design in <br />Exhibit C and Exhibit E. <br />A Colorado Discharge Permit is not required because there is zero process water discharge to surface waters and the <br />process water is nearly 100% recycled back to the mill. <br />6.4.20(10)(b) <br />The stormwater management design has been performed by a CO licensed professional engineer. See this design in <br />Exhibit C and Exhibit E. <br />6.4.20(11)(8-c) <br />A Colorado Discharge Permit is not required because there is zero process water discharge to surface waters and the <br />process water is nearly 100% recycled back to the mill. <br />6.4.20(12) <br />A water quality monitoring plan has been set forth in this Exhibit T, 6.4.20(7)(d) and in Exhibit C, 6.3.3(2)(b). <br />6.4.20(13)(x) <br />There are no liquid containment systems proposed as part of operations. <br />22