2009-06-16_PERMIT FILE - C1981019A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019A
>
2009-06-16_PERMIT FILE - C1981019A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:47:50 PM
Creation date
9/28/2009 10:33:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
6/16/2009
Section_Exhibit Name
4.14 Backfilling and Grading
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 4 PERFORMANCE STANDARDS <br />overburden and spoil on the solid portion of existing benches. The final graded slopes will not exceed the <br />approximate original premining slope grade as shown on the Postmining Topography Map (Map 19). <br />Postmining surface drainage channels will be located to minimize erosion and to minimize slippage. <br />The final pit highwalls will be eliminated in Section 16 by backfilling X seam overburden materials from <br />the West Pit mining area to achieve the final topography. Rehandle of the X seam overburden will occur <br />concurrently with the advance of the multiple-seam advance during the 2003-2010 period. Also, as <br />mining advances into the final pit, the working area on the pit spoil side will decrease to a point where <br />insufficient spoil room below the proposed postmining contours is available. When that point is reached, <br />material will be temporarily placed above the proposed postmining topography. When the final pass of <br />the West Pit is mined out, this temporarily-placed spoil will be rehandled concurrently with Section 16 <br />virgin and rehandle material to fill and slope the pit to the configuration shown on Map 19 (Postmining <br />Topography). Because the area will be redisturbed by the rehandle activities, that portion of the north end <br />of Section 16 that is above final grade will not be topsoiled or otherwise reclaimed until final reclamation. <br />Final reclamation of the East Pit will take place via the sequence shown on Map 29 (Spoil Grading - <br />South Area) with the reclamation blocks advancing from east to west or from the topographic bottom to <br />the topographic top of the mining areas. Just as in the West Pit, all disturbed areas will be returned to <br />approximate original contour by grading and backfilling with the use of draglines, trucks, dozers, scrapers <br />and dozers assisiting a dragline. As reclamation of the East Pit progresses, all non-reclaimed areas will be <br />contained so that any residual runoff from these areas will be isolated within the remainder of the East Pit. <br />All methods of erosion control and stability such as contour ditches, contour furrows, internal ditches and <br />internal sumps will be established on an as-needed basis to ensure the integrity of the Prospect Pond and <br />the surrounding areas include the final East Pit Ditch. Closure of the East Pit is dependent on the final <br />reclamation and closure of the West Pit as the western most portion of the East Pit will tie-in with the <br />West Pit in this area. <br />In addition, Colowyo controls additional coal reserves west and south of Section 9 and 16, outside of <br />Permit C-81-019, that may be considered for future mine expansion. It is possible that the final plans for <br />Section 16 and Section 9 could change to provide for such expansion, with any plan changes being <br />addressed through an appropriate permit revision. <br />4.14.2 General Grading Requirements <br />The final graded slopes at the mining operation will not exceed the approximate original premining slope <br />grade as shown on the Postmining Topography Map (Map 19). Colowyo will retain all overburden and <br />spoil material on solid portions of existing or new benches. The final highwall at the operation will be <br />eliminated by backfilling overburden into the final pit area. <br />Small depressions of a holding capacity slightly greater than one cubic yard of water may be used to <br />create a moist micro climate to aid in shrub establishment. See Section 2.05.4, Planting and Seedings <br />Methods for further information regarding these small depressions. Also, several stock watering ponds <br />will be constructed to compliment the postmining land use. Providing a supply of water is an integral part <br />of the grazing postmining land use. Colowyo will not be mining on any slopes above 20° as shown on the <br />Premining Topography Map (Map 18). <br />Final grading before topsoil placement will be conducted in a manner that minimizes erosion and <br />provides a surface for the topsoil that minimizes slippage. Final grading will be accomplished so that <br />overall grades will not exceed lv:3h. The plan for backfilling and grading is shown graphically on the <br />Spoil Grading Map (Map 29). <br />Rule 4 Performance Standards 4.14-3 Revision Date: 6/5/09 <br />Revision No.: TR-80